The changing landscape at the ninth mile

15 06 2013

One part of Singapore where the landscape has seemed to be in a state of constant flux – at least in more recent times, is the area from the 9th to the 10th milestone of Bukit Timah. The area is one that has long been associated with the old railway, being one of two locations in the Bukit Timah area where an overhead railway truss bridge can be found, and where the train used to run quite visibly along large stretches of the length of the road.

Seeing the tailend of the trains the area is very much associated with - train operations ceased on 30 June 2011.

Seeing the tailend of the trains the area is very much associated with – train operations ceased on 30 June 2011.

A passing train in the 9 1/2 mile area - the stretch was one where the trains running close to the road were quite visible.

A passing train in the 9 1/2 mile area being captured by a crowd in June 2011 – the stretch was one where the trains running close to the road were quite visible.

The truss bridge at the 9th milestone.

The truss bridge at the 9th milestone.

The ninth milestone area is now in a state of change.

The ninth milestone area is now in a state of change.

Another view northwards.

Another view northwards – road widening work is very noticeable.

A train running across the bridge seen just before the closure of the railway in 2011.

A train running across the bridge seen just before the closure of the railway in 2011.

Now abandoned by the railway – the railway ceased operations through Singapore with its terminal moving to Woodlands Train Checkpoint on 1 July 2011, the bridge does remain as what is perhaps one of two reminders of the railway, the other being the two rows of single storey houses facing Upper Bukit Timah Road straddling Jalan Asas which we now know as The Rail Mall, which in being named after the railway, does help to preserve its memory.

The row of single storey houses straddling Jalan Asas in 1989. The houses have since been converted into The Rail Mall.

The row of single storey houses straddling Jalan Asas in 1989. The houses have since been converted into The Rail Mall (photograph used with the kind permission of Henry Cordeiro).

Another photograph of what today has become The Rail Mall.

Another photograph of what today has become The Rail Mall (photograph used with the kind permission of Henry Cordeiro).

All around the area, the construction of  Phase II of the Downtown Line (DTL) of the Mass Raid Transit System (MRT) which started before the railway abandoned it, is very much in evidence. The work being done has left little in its wake untouched, with a wedge being driven between the two carriageways which make up Upper Bukit Timah Road at its junction is with Hillview Road, just north of The Rail Mall, and disfiguring much of the area as we once know it.

9 1/4 milestone Bukit Timah now dominated by new kids on the block as well as cranes and construction equipment.

9 1/4 milestone Bukit Timah now dominated by new kids on the block as well as cranes and construction equipment.

Local model and TV host Denise Keller with sister Nadine seen during a Green Corridor organised walk in the area on the final weekend before the train operations ceased in June 2011.

Local model and TV host Denise Keller with sister Nadine seen during a Green Corridor organised walk in the area on the final weekend before the train operations ceased in June 2011 – even since then, there has been quite a fair bit of change that has come to the area.

Looking down Hillview Road from the junction, we now see that two landmarks in the area which have survived until fairly recently, have also fallen victim to the developments which will also see roads being widened – a major widening exercise is currently taking place along Upper Bukit Timah Road. A railway girder bridge which looked as if it was a gateway to an area it hid which had housing estate and factories which came up around the 1950s and 1960s, has already been dismantled. That went soon after the railway did. Its removal does pave the way for the road to eventually be widened, thus permitting the private residential developments intended for the vacant plot of land that was occupied by the former Princess Elizabeth Estate. The land for the estate, based on newspaper reports from the 1950s, was a donation by Credit Foncier intended for public housing made to the Singapore Improvement Trust in 1950 and has somewhat sacrilegiously been sold off to the highest bidder.

A train crossing the now missing girder bridge at Hillvew Road in early 2011.

A train crossing the now missing girder bridge at Hillvew Road in early 2011.

Along with the bridge, a building that has long been associated with the corner of Upper Bukit Timah and Hillview Roads is another structure we would soon have to bid farewell to. Completed in 1957 as a branch of the Chartered Bank (which later became Standard Chartered Bank), the building has also long been one of the constants in the area. When the branch vacated the premises early this month, it would have have seen some fifty-six years and two months of operation at the building, having opened on 6 April 1957.

The recently closed Chartered Bank branch building with a notice of its closure.

The recently closed Chartered Bank branch building with a notice of its closure.

Rendered insignificant by hoardings, towering cranes and construction equipment – as well as more recent buildings in the vicinity that now dominate the landscape, the bank building occupying the corner of Hillview Road on a little elevation was one that, in greener and quieter days, was not missed. It provided great help to me as a landmark on the bus journeys I took to visit a friend’s house up at Chestnut Drive, two bus stops north, back in the 1980s.

The Chartered Bank, a popularly referred to landmark in the area, as it looks today.

The bank as it looked in 2010.

It would probably take a few more years for the dust in the area to settle. And judging by the way developments seem to be taking most of what did once seem familiar, by the time the dust does settle,  there may be little for us to make that connection with the world  the area did host in days that already seem forgotten.

A last look at a landmark soon to vanish.

A last look at a landmark soon to vanish.

277A2957

277A2945





Bukit Timah Railway Station revisited

7 02 2013

It was in the final days of the Malayan Railway’s operations through Singapore just over a year and a half ago that the former Bukit Timah Railway Station drew crowds it that had not previously seen before. The station, built in 1932 as part of the Railway Deviation which took the railway towards a new terminal close to the docks at Tanjong Pagar, was one that was long forgotten. Once where prized racehorses bound for the nearby Turf Club were offloaded, the station’s role had over time diminished. Its sole purpose had in the years leading up to its final moments been reduced to that of a point at which authority for the tracks north of the station to Woodlands and south of it to Tanjong Pagar was exchanged through a key token system. The practice was an archaic signalling practice that had been made necessary by the single track system on which the outbound and inbound trains shared. It had in its final days been the last point along the Malayan Railway at which the practice was still in use and added to the impression one always had of time leaving the station and its surroundings behind. It was for that sense of the old world, a world which if not for the railway might not have existed any more,  for which it had, in its calmer days, been a place where one could find an escape from the concrete world which in recent years was never far away. It was a world in which the sanity which often eludes the citizens of the concrete world could be rediscovered. It is a world, despite the green mesh fencing now reminding us of its place in the concrete world, which still offers that escape, albeit one which will no longer come with those little reminders of a time we otherwise might have long forgotten.

Scenes from the station’s gentler days

JeromeLim Railway 019

JeromeLim Railway 021

JeromeLim Railway 023

JeromeLim Railway 024

JeromeLim Railway 025

JeromeLim Railway 002

JeromeLim Railway 005

JeromeLim Railway 006

JeromeLim Railway 007

JeromeLim Railway 009





The silence of a world forgotten

10 12 2012

I recently had a look in and around the former Bukit Timah Railway Station, lying quiet and abandoned while plans have not been made for its future use. The station, the last on the old Malayan Railway (known in more recent times as Keretapi Tanah Melayu or KTM), where the old key token exchange system was employed, was vacated on 1 July 2011 when the southern terminal of the railway was moved to Woodlands, and is now a conserved building.

A bridge that's now too far.

A bridge that’s now too far.

Bukit Timah Railway Station is now world that almost seems forgotten.

A world that almost seems forgotten.

The station is one that was built as part of the 1932 railway deviation. The deviation raised the line (hence the four bridges south of Bukit Panjang – one of which, a grider bridge over Hillview Road, has since been removed), as well as turned it towards Holland Road and the docks at Tanjong Pagar. Bukit Timah Railway Station in more recent times prior to its closure operated almost forgotten, seen mainly by passengers on passing trains, operated only in a signalling role. It was only as the closure of the railway line through Singapore loomed that more took notice of the station and the archaic practice of exchanging key tokens.

A window into the forgotten world.

A window into the forgotten world.

The ghost of station masters past?

The ghost of station masters past?

Together with the nearby truss bridge, one of two longer span railway bridges over the Bukit Timah area, which in some respects gives the area some of its character, the station lies today somewhat forgotten. The frenzy that accompanied the last days of the railway and the days that followed prior to the removal of the tracks has since died down – the post track removal turfing work intended to level the terrain and prevent collection of rain water has probably served to do the opposite and rendered the ground too soft and mushy to have a pleasant walk on).

The tracks along much of the rail corridor has since been removed with only short sections such as this one at the truss bridge at close to Bukit Timah Railway Station left behind.

The tracks along much of the rail corridor has since been removed with only short sections such as this one at the truss bridge at close to Bukit Timah Railway Station left behind.

The last half dozen or more than 30 levers that were once found in the signalling room of the station.

Through broken panes, the last half dozen of more than 30 levers that were once found in the signalling room of the station is seen.

While interest in the rail corridor seems to have faded with the passage of time, there may yet be motivation to pay a visit to it in the next month or so. A recent announcement (see Removal of structures along Rail Corridor dated 23 Nov 2012) made by the Singapore Land Authority (SLA) points to the removal of unsound structures. These unsound structures include two of the signal huts at the former level crossings, one of which does have a memorial of sorts to the last day of railway operations and the last train. Besides the huts, some buildings that served as lodgings including the ones at Blackmore Drive, will also be demolished. Work on removal of the structures, based on the announcement, are to be completed by the end of January 2013 and this December probably offers the last opportunity to see the affected areas of the rail corridor as it might once have been.

A Brahminy Kite flies over the formaer railway station.

A Brahminy Kite flies over the formaer railway station.

277A0006





A gradual reopening of the Rail Corridor

2 09 2011

Members of the media and the Rail Corridor working group were provided with an update on the track removal works and plans to reopen parts of the Rail Corridor as work is being completed early this morning during a walkabout in the vicinity of Bukit Timah Railway Station with Minister of Law, Mr. K Shanmungam, the Minister of State (National Development) BG Tan Chuan-Jin, the Senior Parliamentary Secretary, Ministry of Education & Ministry of Law, Ms Sim Ann, and officers from the SLA, MND, URA and Nparks.

Minister of Law, Mr Shanmugam briefed members of the media and the Rail Corridor Consultation Group on the progress of SLA's track removal work and the reopening of the Rail Corridor for use by the community.

Mr Shanmugam being briefed by a SLA officer near the truss bridge.

The Minister also responded to concerns raised by members of the public about damage to existing vegetation during track removal works in the vicinity of the station and explained that the SLA had been “aware of the need to preserve vegetation and no trees were removed”. He also stated that turfing works over the area of the removed tracks, which is now quite evident, was necessary to ensure that there was little risk of water ponding. The tracks, all ancilliary structures such as signal posts, kilometre markers and the ballast are being removed and returned as part of the agreement with Malaysia, with the exception of a stretches in way of the platforms of the two conserved stations and the three bridges that will be retained.

Turfing work south of Bukit Timah Railway Station.

A section of the tracks in way of the Bukit Timah Railway Station platform is being retained.

Another view of Bukit Timah Railway Station. Besides the tracks, one sign and several other structures are being kept.

A map at the station showing SLA's removal plans which identify the bridges that will be retained.

The truss bridge at Bukit Timah / Dunearn Roads with trufing work and the portion of tracks to be retained very much in evidence.

The SLA also announced the reopening of a 1.4 kilometre stretch of the Rail Corridor where track removal and turfing work is being completed from the 16th of September. The stretch is from the steel truss bridge over Bukit Timah / Dunearn Road southwards. This will allow members of the public to enjoy walks along the stretch. Work to remove the tracks is scheduled to be completed by 31st December this year and portions of the former railway land will be progressively opened to the public as the removal works are being completed.

Rather than the green SLA signs we are used to, signs welcoming the public are being put up along the stretches of the Rail Corridor that are bing reopened.

The portion of the track being retained at the truss bridge at Bukit Timah / Dunearn Roads. a 1.4 km stretch from the bridge southwards is being opened up to the public from 16th September.

Mr Shanmugam being interviewed by members of the media at Bukit Timah Railway Station.

Mr Shanmugam speaking to Mr Leong Kwok Peng of the Nature Society (Singapore).

The public will also have access to the former Bukit Timah Railway Station building. Members of the public are advised refrain from acts vandalism, which the bridges and the tracks have been subject to. The station as we see today, has been stripped of items belonging to the railway, including signalling equipment and signal levers (except for six that remain). The station sign on the north end has also been returned to Malaysia, with Singapore retaining the one on the south end. The longer term plans for Bukit Timah Railway Station will be part of the URA’s comprehensive review of development plans for the former railway land and their surrounding areas and as part of its review, the URA will study the possibility of marrying development and greenery, such as applying innovative strategies to maintain a continuous green link along the rail corridor without affecting the development potential of the lands.

The Station Master's room at Bukit Timah Station, stripped of the safe which sat on the yellow support structure next to the door.

Another view of the room where the key token signal equipment had once been placed.

All that are left are six signal levers.

Another view of the six signal levers.


Photographs proivided by SLA explaining the track removal process:






A final journey: the last passage to the north

5 07 2011

From where I left off on the previous post, the 0800 Ekspres Rakyat left Tanjong Pagar late at 0838. The train then continued its passage to the north, a passage that I would be able to take in for the very last time from the vantage point of a train – the final homecoming on The Last Train into Tanjong Pagar coming in the dark of night. The passage has been one that I have especially been fond of, taking a passenger on the train past sights of a charming and green Singapore that is hidden from most, sights which in entirety can only taken in from the train. This last passage in the dim light of the rainy morning was one that was especially poignant for me, knowing that it would be one that I would take accompanied by the groan of the straining diesel locomotive, the rumbling of the carriages over the tracks, and the occasional toot of the whistle.

The morning train offered passengers a last glance at the passage through the rail corridor in Singapore.

The short passage takes all but half an hour, taking the train from the greyer built-up south of the island around where Tanjong Pagar Station is, to the greener north of the island. The passage takes the train first out from the platform and through an expansive area where the view of the familiar train yard is mixed with the familiar sights of the Spottiswoode Park flats, the old and new signal houses, and the Spooner Road flats, before it goes under the Kampong Bahru Bridge towards the corridor proper. The initial 10 minutes of the passage is one that brings the train past Kampong Bahru, along the AYE for a distance, before coming to the first bit of greenery as it swings past Alexandra Hospital and up the Wessex Estate area towards the flats to the right at the Commonwealth Drive / Tanglin Halt areas – an area I am acquainted with from spending the first three and the half years of my life in. It is just after this, close to where the actual train stop which gave its name to Tanglin Halt first encounters a newer and more desired railway line, passing under the East-West MRT lines at Buona Vista.

The Spooner Road KTM flats on the left and the Spottiswoode Park flats in the background as well as the expansive train yard provided the backdrop for many a journey out of Tanjong Pagar.

It is soon after that the anticipation builds as the train passes by the Ghim Moh flats towards Henry Park. Just north of this is the area with arguably the prettiest bit of greenery along the entire stretch of the green corridor. We come to that the train passes under the concrete road bridge at Holland Road. The sight of the bridge also means that the train is just a minute or so away from what used to be the branch-off for the Jurong Line which served the huge industrial estate, and then what is perhaps the jewel in the crown along the corridor, the quaint old station at Bukit Timah. At Bukit Timah Station the old fashioned practice of changing the key token to hand back and over authority for the two sections of the single track through Singapore is undertaken, a practice replaced by technology along the rest of the Malayan Railway line. Beyond Bukit Timah is the rather scenic passage to the north through whichtwo truss bridges, four girder bridges and five level crossings are crossed before reaching the cold and unfriendly train checkpoint at Woodlands. That offered the passenger the last fifteen minutes to savour the passage through Singapore and some of the sights that will not be seen again. The level crossing are one of those sights – something that is always special with the sight of cars waiting behind the barriers or gates, yielding to the passing train – a rare sight that I for one have always been fond of seeing. All too soon it had to end … the rain washed morning provided an appropriate setting for what now seems like a distant dream, one of a forgotten time and certainly one of a forgotten place.

The 30th of June saw the last time the exchange of key tokens being carried out along the KTM line. Bukit Timah Station was the last place where the old fashioned practice of handing authority to the trains using a single track was carried out on the Malayan Railway.

II

the last passage to the north

0839: A last glance at Tanjong Pagar Station as the Ekspres Rakyat pulls out.

0839: A quick glance the other way at teh old signalling house ...

0839: The train pulls past the cluster of houses before the train yard comes into sight.

0839: The new signalling house comes into sight.

0840: The train passes a locomotive being moved from the train yard.

0840: A ast glance at where the Spooner Road flats which housed the railway staff and their families.

0843: A passenger Gen smiles in the passageway of the train carriage. Gen was the last to decide to join the group, deciding only to do so the previous day.

0848: The train passes under the new railway, the MRT line at Buona Vista. Hoardings around seem to indicate that the area would soon be redeveloped.

0848: The Ghim Moh flats come into view.

0851: Through the greenest area of the Green Corridor - the Ulu Pandan area close to where the Jurong Line branched off.

0853: Bukit Timah Station comes into view ...

0853: Key tokens are exchanged as a small crowd looks on ... the train slows down but doesn't stop.

0853: The train crosses the first of two truss bridges over the Bukit Timah Road ...

0854: A look back towards the bridge and Dunearn Road ....

0854: The train speeds past Rifle Range Road and the strip of land next to what was the Yeo Hiap Seng factory .... this is one area that I well remember on my first train journey in 1991 when the narrow strip of land hosted the small wooden shacks of many squatters who occupied this stretch of railway land.

0854: A glance at to the right at Rifle Range Road

0854: Passing over the danger spot close to where the short cut many take to Jalan Anak Bukit is.

0854: The train passes under the road bridges at Anak Bukit ...

0855: The bridges at Anak Bukit are left behind ...

0855: Over the girder bridge at Hindhede Drive

0856: The very green corridor near Hindhede Quarry ...

0856: Into the mist at the foot of Bukit Timah Hill towards the second truss bridge.

0857: A passenger Angie, sticks her head out to have a better look at the amazing greenery.

0858: The train continues on its way after crossing the second truss bridge.

0858: Through the Hillview pass.

0859: A lone man greets the train with an umbrella near the Dairy Farm Road area.

0859: The greenery greets the train around the Bukit Gombak area.

0859: The closed gate and waiting cars at the first of five level crossings at Gombak Drive.

0900: Towards the second and widest level crossing at Choa Chu Kang Road ... Ten Mile Junction comes into view.

0900: A small group of people gathered at the Choa Chu Kang Road level crossing to greet the passing train. The signal hut marks the location of what was Bukit Panjang Railway Station from where the first train to pull into Tanjong Pagar Station departed on 2nd May 1932 at 4.30 pm.

0901: Across the Bukit Panjang (or Choa Chu Kang Road) level crossing and under another new railway line - the Bukit Panjang LRT.

0902: Past an area I became acquainted with through my days in National Service ... the Stagmont Hill area.

0903: Across the third level crossing at Stagmont Ring Road.

0904: The fourth level crossing the Mandai crossing at Sungei Kadut Avenue.

0904: Past the KTM houses at Sungei Kadut Avenue and onward towards Kranji.

0907: Across the last (and narrowest) of the level crossings at Kranji Road and on towards Woodlands Train Checkpoint.

0907: Looking back at the Kranji level crossing and at the last of the rail corridor through Singapore ... time to get left to disembark the train for immigration clearance out for the very last time.

0908: Arrival at Woodlands Train Checkpoint - no photo taking allowed.


Posts on the Railway through Singapore and on the Green Corridor:

I have also put together a collection of experiences and memories of the railway in Singapore and of my journeys through the grand old station which can be found through this page: “Journeys through Tanjong Pagar“.

Do also take a look at the proposal by the Nature Society (Singapore) to retain the green areas that have been preserved by the existence of the railway through Singapore and maintain it as a Green Corridor, at the Green Corridor’s website and show your support by liking the Green Corridor’s Facebook page. My own series of posts on the Green Corridor are at: “Support the Green Corridor“.






The morning after

2 07 2011

I took a walk the morning after the party along the corridor that welcomed the last train to pull into Tanjong Pagar which became the last ever Malayan Railway train that the same crowd waved into the darkness of the night. It was a walk to take in a wonderfully fresh and green world that close to eight decades of the railway corridor as we know today had given to us. It is a world that I had become first acquainted with from my numerous journeys on the trains that we now see no more, a world apart from the modern world we have since become comfortable finding a fit into. It is a world that I for one often chose to escape to. The station at Bukit Timah and the area around it being a stretch of the corridor, that in its relative obscurity, has often provided me with a welcome respite from the hectic world that lay just 200 metres away down a narrow path from the station. What is to become of this wonderful world now that we have sent the last of the trains through it off, we don’t now know, but there are certainly many who wish to see that the charm of the green world that lines the corridor kept as it now is, providing a world that many in Singapore can as I have done run off to …

The former rail corridor provides an escape from the urban world we live in.

The greenery is a refreshing change to the grey world we live in.

The walk down the stretch that I covered started at the bridge at Holland Road through an area that is possibly one of the more scenic stretches of the corridor, leading to that quiet little building that has in the last month come alive with many hoping to bid farewell to the railway and the wonderful people who ran the railway through Singapore. As I walk through the clearing mist, I felt a surreal sense of peace, one that the air of silence of a corridor that has descended after eight decades of silence punctured by the occasional sound of steam engines, horns and whistles and more recently, the drone of the diesel engines and the air operated horns and whistles that most will now remember. The air of calmness was all encompassing and that with the cool of the morning air made the walk down that stretch especially invigorating.

The lifting mist enhanced the surreal feel to the now surreally silent corridor.

It wasn’t long before I reached the tiny building that served as Bukit Timah Railway Station … and again, the silence that greeted me was somewhat surreal, in stark contrast to the amazing and frenzied scenes of the night’s send off just eight hours before my arrival at the now silent building. The flags that fluttered from the flagpoles that stood between the station’s building and the platform were missing, the station’s door was firmly shut, as the station stood forlornly alone in a world that no longer has a use for it as a station. At the north end of the station, the sight of a burly security guard against the backdrop of the now silent station and tracks and the green Singapore Land Authority sign confirmed the station’s demise … no longer would we see that men in blue working tirelessly passing and receiving the looped piece of wirerope with a pouch at the end. With the passing of the last train in … the last of the old fashion practice of handing authority to the trains on the single stretch of track by means of the key token had also passed into history on the Malayan Railway line …

Bukit Timah Station now sits in silence and wears the forlorn look of an unwanted structure, in contrast to scenes just 8 hours before when a frenzied crowd had gathered in the dark of night to send the last train off. The building is now a conserved building.

The signs are now up ... just hours after the handover and a security detail is in place.

The flags have stopped fluttering in the wind and the doors are now closed.

The security detail is provided to guard against any attempts to remove items (some of which are KTM property) from and to prevent vandalism at the station.

The passing of the trains provides what was I guess a first opportunity to walk on the bridges – something that many have risked their lives doing when the line was still active despite the warnings that have been given. Now, it is safe … as is the narrow northern stretch of the corridor lay beyond the truss bridge near Bukit Timah station. I did just that, walking the narrow 3 kilometre length towards the next truss bridge close to where the Rail Mall is. My most recent encounter with it was of course through the opened door of the train through which the rushing of greenery, the yellow of the kilometre markers and the wind blowing in my face provided me with a different perspective to the one I could now take in at leisure. The stretch is one on which work to remove the tracks would come later, with some parts of the track laid with monitoring equipment for the Downtown MRT line which is being constructed almost parallel to the old railway line. It is the sense of peace and quiet that surround me that I enjoyed, together with the wonderful green that made the walk all worthwhile … and while I do feel a deep sense of loss of a railway that I so love, I do hope to see that at least the memory of it is kept by preserving this ready made escape from the hectic world we spend too much of our time in. In news that came through on the afternoon after my walk, the URA and SLA have, in an encouraging move responded to requests by the public to allow the tracks and corridors to be explored by opening up the railway corridor for the public for 2 weeks. In the same new release, the URA and SLA are also seeking public feedback on the use of the railway land. More information can be found in the URA’s news release below.

A last look before the station is fenced off ....

The cessation of train services to Tanjong Pagar allows access for the public to the previously dangerous bridges.

A window into the wonderfully green and peaceful world beyond the road bridges at Rifle Range Road.

The fence of the former Yeo Hiap Seng factory still lines the railway corridor by Rifle Range Road.

The stretch from Rifle Range Road to Hindhede.

A colourful resident of the Green Corridor.

On top of the girder bridge over Hindhede Road - one of the bridges that would be retained.

The approach to the end point of my morning after walk .... the truss bridge near the Rail Mall.


Posts on the Railway through Singapore and on the Green Corridor:

I have also put together a collection of experiences and memories of the railway in Singapore and of my journeys through the grand old station which can be found through this page: “Journeys through Tanjong Pagar“.

Do also take a look at the proposal by the Nature Society (Singapore) to retain the green areas that have been preserved by the existence of the railway through Singapore and maintain it as a Green Corridor, at the Green Corridor’s website and show your support by liking the Green Corridor’s Facebook page. My own series of posts on the Green Corridor are at: “Support the Green Corridor“.


URA/SLA’s Press Release

1 July 2011

Public works and future plans for former railway land

The lands previously occupied by Keretapi Tanah Melayu (KTM) for railway use have been vested in the Singapore Government with effect from 1 July 2011.

As agreed with Malaysia, Singapore will remove the tracks and ancillary structures of the KTM railway and hand them over to Malaysia. The Singapore Land Authority (SLA) will commence these removal works as well as conduct maintenance works around the various railway sites shortly.

Public Can Access the Railway Tracks

Nevertheless, in response to requests for an opportunity for the public to trek along and experience the tracks, the SLA will be staging its works. From 1 Jul 2011 to 17 Jul 2011, the entire line of railway tracks will be open to public for 2 weeks, except for some localised areas.

After 17 Jul 2011, a 3km stretch of railway tracks from Rifle Range Road to the Rail Mall will continue to be open to the public till 31 Jul 2011.

As the railway tracks can be narrow and rough at certain locations, members of the public are advised to exercise caution when walking along the track.

The Tanjong Pagar Railway Station and Bukit Timah Railway Station will be closed temporarily to facilitate the moving out of the furniture and equipment by the KTM and its tenants. The SLA will also carry out maintenance works and structural inspection. More information on their re-opening will be provided to the public in due course.

Removal Works along the Railway Tracks

From 1 Jul to 17 Jul 2011, minor works will be carried out at the Bukit Timah Railway Station and the railway crossings at Kranji Road, Sungei Kadut Avenue, Choa Chu Kang Road, Stagmont Ring and Gombak Drive. Members of the public should avoid these work areas which will be cordoned off.

Works to remove the railway tracks along the rest of the former railway line, except for the 3km stretch from Rifle Range Road to the Rail Mall, will commence from 18 July 2011. The removal works include the clearance of minor buildings, sleepers, tracks, cables, gates, posts and debris around the various sites from Tanjong Pagar to Woodlands. Other items to be removed include railway equipment, such as signal lights, level crossings, controllers and traffic lights. The removal works are to be fully completed by 31 December 2011.

Due to these extensive removal works, the affected areas will be secured and cordoned off. For safety reasons, members of the public are advised to keep away from these areas whilst the removal works are ongoing.

Public Feedback Sought

The Urban Redevelopment Authority (URA) will comprehensively review and chart the development plans for the former railway lands and their surrounding areas. As part of its review, the URA will study the possibility of marrying development and greenery, such as applying innovative strategies to maintain a continuous green link along the rail corridor without affecting the development potential of the lands.

The URA welcomes feedback and ideas from the community in shaping the future development plans for the railway lands. The members of the public are invited to visit and provide their ideas at www.ura.gov.sg/railcorridor/.

Issued by:
Singapore Land Authority & Urban Redevelopment Authority






A send off at the weekend for our old friends …

27 06 2011

Singapore residents were out in force to wave goodbye to the Malayan Railway that has been very much a part of the island’s landscape for over a century during the final weekend of its operations. It wasn’t just at Tanjong Pagar Railway Station which possibly because of the last day of operations of its food stalls today, has seen a large increase in visitors over the last week, but many other places along the line. At the We Support the Green Corridor’s walk in the morning, the largest crowd seen in the series of walks conducted over several months to raise awareness of the proposal by the Nature Society (Singapore) or NSS to retain the soon to be vacated railway corridor as a continuous green corridor through Singapore, of more than 120 that included local model and TV host Denise Keller gathered at the Rail Mall at 8 am to take a 3 km walk north not only to acquaint themselves with glimpses of the green corridor, but also to an area that was of historical significance to the first days of Tanjong Pagar Railway Station, being the area where the first train that pulled in to Tanjong Pagar, had departed with its load of passengers that included Sir Cecil Clementi, the then Governor of Singapore, who opened Tanjong Pagar Railway Station on the 2nd of May 1932.

Among the more than 120 participants in the We Support the Green Corridor Walk was local TV personality and model Denise Keller.

The starting point of the We Support the Green Corridor walk was in the shadow of one of one of two truss bridges that give the Bukit Timah area its character, which was referred to in a comment left on the Facebook Page of the We Support the Green Corridor by the Minister of State for National Development Tan Chuan Jin, which seemed to indicate it, along with the bridge at Bukit Timah Road near Bukit Timah Station and the bridge at Hindhede (at the entrance to Bulit Timah Hill Nature Reserve) would be retained. The news of this was certainly greeted by many with relief and even expressions of joy. The ending point of the walk was at the Bukit Panjang level crossing, what is the widest level crossing in Singapore close to where that first train to Tanjong Pagar had departed from at a station that no longer exists, Bukit Panjang. Through much of the walk, signs of the massive construction efforts to get what is ironically a new railway in the form of the Downtown MRT Line that takes a course for much of its way along what was the original Singapore to Kranji Line that was deviated to turn the line towards Tanjong Pagar. It is also ironic that the new railway would in all probability hasten the greying of a corridor that the old railway has for so many years kept green for us.

Participants on a We Support the Green Corridor walk caught a glimpse of a southbound train on the black truss bridge over Upper Bukit Timah Road. Many on the walk expressed relief when they learnt that this bridge was not part of the structures that would be removed in tender awarded to Indeco to dismantle the tracks and ancilliary structures scheduled to be carried out from July to November 2011.

Through much of the accessible parts of the green corridor and at Bukit Timah Station, there were indeed many who were seen to greet the passing trains, a last chance for many to see the passing of trains through Singapore and to bid farewell to a railway that will leave many who have taken a ride on it through the archways of the magnificent station at Tanjong Pagar with a sense of sadness and loss and to a group of people who through their dedication has provided Singapore with a wonderful association with the railway going back to 1903 when the Singapore to Kranji Line was completed. The outpouring of feeling is perhaps driven by the sense of loss not just for a railway that has served us for so long, but also for a landscape that could change drastically once the railway stops operating through Singapore. It is this landscape that many hope will be preserved, there is of course a balance between development and conservation that has to be found in all this, and while the railway land does free up development opportunities in many parts of Singapore, the benefits of maintaining a continuous green corridor as a shared recreational space which can also be used as an uninterrupted path from the north to the south of the island with which the use of bicycles as a means of transport becomes viable, cannot be understated. It is therefore encouraging that the Mr Tan Chuan Jin has in his comments stated that the authorities “remain committed to working closely with NSS and others who love this stretch of land so that we can develop this sensibly together”.

Many gathered at many places along the line to wave at the drivers of passing trains.

Many others were seen walking down the tracks for one last time ...

With that, there certainly is hope for a solution that would, as we wave our goodbyes and extend our gratitude to a railway and the men of the railway that we will soon lose, perhaps see some of the wonderful places and spaces that the railway has left behind be retained as it is for not just us but also for our future generations – that may at least preserve that fond memory of an old railway line that once ran right through the heart of Singapore.

The crowd at Bukit Timah Station.

... a passage to the north which on the 30th of June will no longer be used ...


Posts on the Railway through Singapore and on the Green Corridor:

Information related to the station and its architecture can be found on a previous post: “A final look at Tanjong Pagar Station“. In addition to that, I have also put together a collection of experiences and memories of the railway in Singapore and of my journeys through the grand old station which can be found through this page: “Journeys through Tanjong Pagar“.

Do also take a look at the proposal by the Nature Society (Singapore) to retain the green areas that have been preserved by the existence of the railway through Singapore and maintain it as a Green Corridor, at the Green Corridor’s website and show your support by liking the Green Corridor’s Facebook page. My own series of posts on the Green Corridor are at: “Support the Green Corridor“.


Comments made by Minister of State for National Development Mr Tan Chuan Jin on the We Support the Green Corridor’s Facebook Page:

These 3 bridges are part of the agreement that will go back to Malaysia (Sg Mandai, Junction 10 and over Hill View Road). It has been a long negotiation process over many many things. We have retained what we can, including stretches of railway in areas near the stations. I am sure you know that these 3 are not the same as the iconic steel girder (believe he meant “truss”) bridges across Upper Bt Timah and Bt Timah Rds. The one at Hinhede will also remain. The other one close to Sunset Way that spans across Ulu Pandan Canal already belongs to us and will remain so.

We remain committed to working closely with NSS and others who love this stretch of land so that we can develop this sensibly together.

Our friends at URA and NParks care for the environment and heritage as much as many of you do but they also have to grapple with the dilemmas of ensuring living space for the many young Singaporeans who will be coming of age in the years ahead. As I have pointed out in my note, we are actively greening and blueing where we can and to work with the environment as much as possible.









Follow

Get every new post delivered to your Inbox.

Join 2,374 other followers

%d bloggers like this: