Parting glances: Tanjong Pagar Railway Station as it will never again be

25 08 2016

The time has come to say goodbye, albeit a temporary one, to another old friend. The former Tanjong Pagar Railway Station is set to be closed come the new year so that the extension of the Circle Line MRT and the construction of a MRT station can go on beneath it. If all goes well, it will only be reopened in 2025, by which time it will have a feel that will be very different  that which has existed at the station through the grand art-deco inspired station’s 84 year history.

JeromeLim-1124

The famous façade of the station features four triumphal figures sculptured by Angelo Vannetti of the Raoul Bigazzi Studios in Florence that represent the then four pillars of the Malayan economy.

The former station holds the memories of many. The railway’s mostly Malaysian staff still speak fondly of their days in what has to be one of the grander stations to serve along the Malayan railway. There also are the memories of the numerous passengers who passed through its especially grand vaulted main hall; many depended on the railway not just for forays across the causeway, but also as a well used link for the thousands who commuted from the homes in southern Johor to Singapore for their work and even to attend school.

Murals decorate the main hall. The hall also features two booths made of teak wood that have since been painted over.

Murals decorate the main hall. The hall also features two booths made of teak wood that have since been painted over.

A view of the main hall.

A view of the main hall without the clutter of the last days.

As part of the Request for Proposals (RFP) to develop a concept plan for the Rail Corridor, which was returned to Singapore on 1 July 2011, a concept design was sought for the adaptive reuse of the former station for an interim period of 20 years. During this period, the nearby port facility the station had been positioned to serve, will make a westward move, following which plans for the Greater Southern Waterfront, into which the former station will be incorporated, will be firmed up.

The end of the line. This year is the last year we get to take in this perspective. It is one that has greeted three generations of travellers coming by train to Singapore for some 79 years before the closure of the railway at the end of June 2011.

The end of the line. This year is the last year we get to take in this perspective. It is one that has greeted three generations of travellers coming by train to Singapore for some 79 years before the closure of the railway at the end of June 2011.

The completion of the Circle Line also dovetails into this and the tunnels for the line will run directly under the station to minimise the potential for uneven ground settlement and the risk of damage to the precious structure of the National Monument. A MRT station, Cantonment Station (its working name), is also being built under a part of the station’s platforms. For this, sections of the platforms, which had apparently been assembled in a modular manner, will be removed and stored to allow excavation work to be carried out for the MRT stations’s construction. The intention will be to reinstate the removed platform sections and refurbish them after the work for the MRT station is completed.

Gaps in the station's platforms, said to be amongst the longest in the Malayan Railway's stations, point to where the modular sections come together.

Gaps in the station’s platforms, said to be amongst the longest in the Malayan Railway’s stations, point to where the modular sections come together.

One of the things that is apparently being looked at by the winning team for the RFP’s adaptive reuse of the former station, is how, besides the use of the station as a gateway into the Rail Corridor as a community space, is the integration of the MRT station under its platforms into it. This may see an additional MRT station entrance between the platforms that will see traffic of passengers of the new train line over the platforms and through the former station’s main building.

05-railcorridor-tprs

An impression of the MRT station’s entrance between the platforms produced by MKPL. New platforms are shown in this impression as it was initially thought that the sections of the platforms in way of the MRT station would have to be demolished to allow excavation work.

06-railcorridor-tprs

The reverse view of the proposed MRT station’s entrance between the platforms. A canopy over it will be one of the interventions that will be necessary (MKPL).

While this may necessitate several interventions that will alter the feel the former station once provided, it will be a rather meaningful outcome for the former railway station that in the words of the winning team MKPL Architects Pte Ltd and Turenscape International Ltd, will have “the former station, connecting Singapore’s past, present and future”. Another thing being looked at is the beautifying of the space fronting the station currently used as a car park as a “Station Green” – a landscaped garden intended to allow a better appreciation of the station’s grand façade.

MKPL/Turenscape proposes to replace the car park, currently in front of the former station, with a landscaped garden.

MKPL/Turenscape proposes to replace the car park, currently in front of the former station, with a landscaped garden.

For those who want to take a last look at the former station before it closes and is forever altered, only three opportunities possibly remain. These coincide with the anticipated open houses that will be held over the year’s three remaining public holidays. The last will be Christmas Day, a widely commemorated holiday that for the members of one of the larger religious communities here in Singapore, is one of promise. Built with a promise that could never be fulfilled, the grand old station will close after Christmas Day, with a new promise for its future.

The platforms, were of a length to accommodate the longest mail trains.

The length of the platforms, said to be among the longest in the FMSR’s stations, were to accommodate the longest mail trains.

A look up what in the station's last days, was the departure platform.

A look up what in the station’s last days, was the departure platform.

Immigration counters last used by Malaysian immigration officers. These will surely be removed.

Immigration counters on the departure platform last used by Malaysian immigration officers. These will surely be removed.

One of two hydraulic stops at the

One of two hydraulic stops at the end of the tracks – one was returned following the handover of the station.

Memories of teh tarik.

Memories of teh tarik.

Rooms that were used by logistics companies at the former station - these possibly will be converted for use by F&B or retail outlets in the future.

Rooms that were used by freight forwarders at the former station – these possibly will be converted for use by F&B or retail outlets in the future.

Another look into a freight forwarders' storeroom.

Another look into a freight forwarders’ storeroom.

A booth. Last used by the auxiliary police at the station, the booth had in its early days, been used by the convenience shop that operated at the station.

A booth. Last used by the auxiliary police at the station, the booth had in its early days, been used by the convenience shop that operated at the station.

The inside of the former ticketing booth.

The inside of the former ticketing booth.

Beautiful soft light illuminates some of the rooms along the main hall.

Beautiful soft light illuminates some of the rooms along the main hall.

A part of the platforms where one could watch the world go slowly by over a cup of teh tarik in the station's last days.

A part of the platforms where one could watch the world go slowly by over a cup of teh tarik in the station’s last days.

Another view of the main hall. There are lots of stories related to the haunting of the third level (section under the letters FMSR at the far end), used previously by the Station Hotel.

Another view of the main hall. There are lots of stories related to the haunting of the third level (section under the letters FMSR at the far end), used previously by the Station Hotel.

The main hall of the station. Part of the vaulted ceiling and batik-style mosaic panels can be seen.

The clutter of the main hall in the station’s last days.

The crowd at Tanjong Pagar late on 30 June 2011 to witness the departure of the last train.

The crowd witnessing Tanjong Pagar’s last moments as a station late on 30 June 2011.

Last journeys.

A final glance at the main hall.

A final glance at the main hall.


A look back at Tanjong Pagar Railway Station

Gazetted as a National Monument in its final days as the southern terminal of the Malayan Raliway, the former Tanjong Pagar Railway Station was built in 1932 as a centrepiece that would underline Singapore’s growing importance as an economic centre in the British Far East. Its position was carefully considered for its envisaged role as a gateway from the southernmost point in continental Asia to the Pacific and Indian Oceans.

Sir Cecil Clementi the Governor of Singapore, in his address at the station’s opening on 2 May 1932, made the observation that it was “a natural junction between land-borne and sea-borne traffic”, adding that it was “where every facility will be afforded for interchange between railway and ocean shipping”.

It was a promise that was not to be fulfilled. Sir Cecil could not have predicted that the railway’s importance as a means of transportation in the Malayan peninsula would diminish and just a little over 79 years since the 5.1.5 pm arrival of the first train from Bukit Panjang Station, the whistle of the last train to depart was heard late into the night of 30 June 2011. An agreement between the governments of Singapore and Malaysia (who through the administration of the railway, also owned the station and the land on which the railway operated through Ordinance 22 of 1918 or the Singapore Railway Transfer Ordinance 1918), which had taken two decades to sort out, saw to the move of the railway’s terminal to Woodlands and with that the transfer ownership  the station and much of the railway land on the island to the Singapore government on 1 July 2011.

Since its closure, the station fell into disuse with the odd event held in the space, and in more recent times, a series of open houses held during public holidays. The location of the former station in what will become the Greater Southern Waterfront has put permanent plans for it on hold. A concept plan for an interim use is however being developed as part of the Rail Corridor RFP by a team led by MKPL Architects and landscape designers Turenscape International. An MRT station for the final stretch of the Circle Line is also being constructed under a section of the platforms, together with the line being run under the station. The work being carried out means that the former station closed to the public for a substantial period of time with the completion of the MRT scheduled for 2025.

The station found use after its closure as a temporary event space.

The station found use after its closure as an event space.

JeromeLim-0153

The rush by the staff at the station to leave on the last train at the end of the final day of operations.

The final journey on the Malayan Railway on 30 June 2011.

A final journey on the Malayan Railway on 30 June 2011.

A few former food stall operators having a last breakfast on 30 June 2011.

A last breakfast on 30 June 2011.

A reflection on the convenience store and the main hall in the last days.

The hardworking last Station Master at Tanjong Pagar - En. Ayub.

The very hardworking last Station Master at the station, En. Ayub.

JeromeLim-0647

The arrival platform with its meal time crowd.

JeromeLim-8072

Coming home.

Returning home, one of the first things that would greet you (post mid 1998) as you walked to the end of the platform was the barrier before you got into the public area. Prior to the move of the SIngapore CIQ, you would first have to pass through Singapore Immigration, Customs and a narrow passage through a fenced area where K9 unit dogs would sniff passengers for smuggled narcotics.

The welcome. One of the first things that would greet passengers after mid 1998 when the Singapore CIQ was relocated to Woodlands. Prior to the move, it would have been necessary to pass through Singapore Immigration, Customs and a narrow fenced passageway where dogs (behind the fence) would sniff passengers for narcotics.

JeromeLim-0289

The wait for a loved one.

JeromeLim-0270

Watching the world go slowly by over a cup of teh tarik.

Tickets would be checked and punched at the departure gate.

The departure gate.

JeromeLim-0299

Leaving on the 8am.

JeromeLim-9308

The walk to Spooner Road.

JeromeLim-9306

Platform end.

JeromeLim-9304

Saying goodbye.

JeromeLim-9759

A welcome home.

A very helpful ticketing clerk, En. Azmi, who was posted to the station on 1st July 1990. He completed a full 21 years at the station when it ceased operations on 30th June 2011.

The very friendly En. Azmi. He was posted to the station on 1st July 1990 and completed a full 21 years of service at the station when it ceased operations on 30th June 2011.

Mr Mahmoodul Hasan who ran the two canteens in the station before its closure.

Mr Mahmoodul Hasan, the M. Hasan in the name of the station’s makan place. He ran the station’s two canteens before its closure.

And last of all one that should not be forgotten - one of the many cats the station was home to.

Catwalk – one of the many cats the station played host to.

The platforms were constructed in a modular manner and LTA is looking at removing the platforms in way of the excavation site in sections and reinstating them.

A view down the platform.

The ticket counter in quieter days - well before the madness of the last two months descended on the station.

The ticketing counter.

Especially when the ticketing computer is down - that in my experience often happened.

An all too common occurrence at the ticketing counter.

A train at the platform.

The last Eastern and Oriental Express train to depart.

Some of those who assisted him at the drinks counter and the popular Ramly Burger stand.

The Ramly Burger stand. Food was one of the draws of the station.

By 12.45 pm, the Briyani had been sold out, brining to an end a chapter for Ali Nacha at the Tanjong Pagar Railway Station.

The day the music died. 12.45 pm on 24 June 2011, when the last plate of Briyani from the popular Ali Nacha stall at the Tanjong Pagar Railway Station was served.

The arrival.

The arrival.

The festive crowd - when queues formed for tickets in the lead up to Chinese New Year. Many with roots in Malaysian would return by train to their home towns for the important holiday (photo source: National Archives online)

The festive crowd – when queues formed for tickets in the lead up to Chinese New Year. Many with roots in Malaysian would return by train to their home towns for the important holiday (photo source: National Archives online).

The main vaulted hall of the station in its early days. An impressive integration of public

The main hall of the station in its early days. The station was built in 1932 to serve as a gateway to the oceans, through the wharves at Tanjong Pagar.  Its opening on 2 May 1932 was marked by the 5.15 pm arrival of a train from Bukit Panjang. The first the public saw of it however, was several months prior to this, when it was used for a Manufacturer’s Exhibition in January 1932.


Advertisement




Closing the Circle

29 10 2015

One of the things the announcement identifying the sites of the Circle Line Stage 6 stations that will not go unnoticed is that parts of the former Tanjong Pagar Railway Station’s platforms will have to be removed for the construction of Cantonment Station. This may come as a surprise to many as the former station, at which operations ceased on 30 June 2011, was gazetted as a National Monument in April of that same year. Currently unoccupied, it is the subject of a concept plan being developed under the Rail Corridor RFP, part of which seeks to identify a use in the interim prior to the development of the future Greater Southern Waterfront.

The final journey on the Malayan Railway on 30 June 2011.

The final journey on the Malayan Railway on 30 June 2011.

The platforms of the former railway station are historically significant. They are amongst the longest found along the Malayan Railway’s lines, having been dimensioned to accommodate the longest mail trains. The platforms however, at least for the stretch that will be affected and based on the April 2011 gazette that accords the former railway station with National Monument status, have not been protected as part of the monument.

An extract of the May 2011 gazette showing the part of the former Tanjong Pagar Railway Station designated as a National Monument.

An extract of the Apr 2011 gazette showing the part of the former Tanjong Pagar Railway Station protected as a National Monument.

The end of the former station's platforms seen after its closure.

The end of the former station’s platforms seen after its closure.

Considerations made in selecting the site of Cantonment Station (its working name) include the need to protect the National Monument from damage as well as the presence of existing structures in the vicinity such as the Keppel Viaduct to the immediate south and HDB flats to the immediate north. Construction would involve tunneling work deep under the former railway station and the excavation of part of the area where the platforms are to construct the station.

The platforms were constructed in a modular manner and LTA is looking at removing the platforms in way of the excavation site in sections and reinstating them.

The platforms were constructed in a modular manner and LTA is looking at removing the platforms in way of the excavation site in sections and reinstating them.

The excavation work in way of the future MRT station will see sections of the platforms removed. It does seem that the intention is to dismantle the parts of the affected parts of the platforms, which were built in a modular manner, and restore and reinstate them once construction is complete. Other options that are being been considered include demolishing the platforms altogether and either reconstructing them in the same style or in a style that is in keeping with the former station’s intended use.

JeromeLim-8594

Work is scheduled to commence in 2017. As this will only be completed in 2025, it does mean that we will not get to see the platforms on which many memories have been made, for close to a decade.

JeromeLim-8147

Thinking about it, it does perhaps make perfect sense to have the new MRT station integrated into the former railway station, whatever its intended reuse in the future. While this may deviate from what had been intended in building the grand old dame, modelled some say after Helsinki Central to serve as the gateway to the oceans, it would be in keeping with its intended use as a transportation hub and serve as a fitting reminder of what once was.

Further information on Circle Line 6 can be found in the joint LTA / SLA Press Release found here.


More of the platforms in forgotten times

JeromeLim-0647

JeromeLim-8072

JeromeLim-8076

JeromeLim-0289

JeromeLim-0270

JeromeLim-0299

JeromeLim-0174

JeromeLim-0153

JeromeLim-8075

JeromeLim-7260

JeromeLim-8085

JeromeLim-9743

JeromeLim-9308

JeromeLim-9306

JeromeLim-9304

JeromeLim-9759