Parting glances: Tanjong Pagar Railway Station as it will never again be

25 08 2016

The time has come to say goodbye, albeit a temporary one, to another old friend. The former Tanjong Pagar Railway Station is set to be closed come the new year so that the extension of the Circle Line MRT and the construction of a MRT station can go on beneath it. If all goes well, it will only be reopened in 2025, by which time it will have a feel that will be very different  that which has existed at the station through the grand art-deco inspired station’s 84 year history.

JeromeLim-1124

The famous façade of the station features four triumphal figures sculptured by Angelo Vannetti of the Raoul Bigazzi Studios in Florence that represent the then four pillars of the Malayan economy.

The former station holds the memories of many. The railway’s mostly Malaysian staff still speak fondly of their days in what has to be one of the grander stations to serve along the Malayan railway. There also are the memories of the numerous passengers who passed through its especially grand vaulted main hall; many depended on the railway not just for forays across the causeway, but also as a well used link for the thousands who commuted from the homes in southern Johor to Singapore for their work and even to attend school.

Murals decorate the main hall. The hall also features two booths made of teak wood that have since been painted over.

Murals decorate the main hall. The hall also features two booths made of teak wood that have since been painted over.

A view of the main hall.

A view of the main hall without the clutter of the last days.

As part of the Request for Proposals (RFP) to develop a concept plan for the Rail Corridor, which was returned to Singapore on 1 July 2011, a concept design was sought for the adaptive reuse of the former station for an interim period of 20 years. During this period, the nearby port facility the station had been positioned to serve, will make a westward move, following which plans for the Greater Southern Waterfront, into which the former station will be incorporated, will be firmed up.

The end of the line. This year is the last year we get to take in this perspective. It is one that has greeted three generations of travellers coming by train to Singapore for some 79 years before the closure of the railway at the end of June 2011.

The end of the line. This year is the last year we get to take in this perspective. It is one that has greeted three generations of travellers coming by train to Singapore for some 79 years before the closure of the railway at the end of June 2011.

The completion of the Circle Line also dovetails into this and the tunnels for the line will run directly under the station to minimise the potential for uneven ground settlement and the risk of damage to the precious structure of the National Monument. A MRT station, Cantonment Station (its working name), is also being built under a part of the station’s platforms. For this, sections of the platforms, which had apparently been assembled in a modular manner, will be removed and stored to allow excavation work to be carried out for the MRT stations’s construction. The intention will be to reinstate the removed platform sections and refurbish them after the work for the MRT station is completed.

Gaps in the station's platforms, said to be amongst the longest in the Malayan Railway's stations, point to where the modular sections come together.

Gaps in the station’s platforms, said to be amongst the longest in the Malayan Railway’s stations, point to where the modular sections come together.

One of the things that is apparently being looked at by the winning team for the RFP’s adaptive reuse of the former station, is how, besides the use of the station as a gateway into the Rail Corridor as a community space, is the integration of the MRT station under its platforms into it. This may see an additional MRT station entrance between the platforms that will see traffic of passengers of the new train line over the platforms and through the former station’s main building.

An impression of the MRT station’s entrance between the platforms produced by MKPL. New platforms are shown in this impression as it was initially thought that the sections of the platforms in way of the MRT station would have to be demolished to allow excavation work.

The reverse view of the proposed MRT station’s entrance between the platforms. A canopy over it will be one of the interventions that will be necessary.

While this may necessitate several interventions that will alter the feel the former station once provided, it will be a rather meaningful outcome for the former railway station that in the words of the winning team MKPL Architects Pte Ltd and Turenscape International Ltd, will have “the former station, connecting Singapore’s past, present and future”. Another thing being looked at is the beautifying of the space fronting the station currently used as a car park as a “Station Green” – a landscaped garden intended to allow a better appreciation of the station’s grand façade.

MKPL/Turenscape proposes to replace the car park, currently in front of the former station, with a landscaped garden.

MKPL/Turenscape proposes to replace the car park, currently in front of the former station, with a landscaped garden.

For those who want to take a last look at the former station before it closes and is forever altered, only three opportunities possibly remain. These coincide with the anticipated open houses that will be held over the year’s three remaining public holidays. The last will be Christmas Day, a widely commemorated holiday that for the members of one of the larger religious communities here in Singapore, is one of promise. Built with a promise that could never be fulfilled, the grand old station will close after Christmas Day, with a new promise for its future.

The platforms, were of a length to accommodate the longest mail trains.

The length of the platforms, said to be among the longest in the FMSR’s stations, were to accommodate the longest mail trains.

A look up what in the station's last days, was the departure platform.

A look up what in the station’s last days, was the departure platform.

Immigration counters last used by Malaysian immigration officers. These will surely be removed.

Immigration counters on the departure platform last used by Malaysian immigration officers. These will surely be removed.

One of two hydraulic stops at the

One of two hydraulic stops at the end of the tracks – one was returned following the handover of the station.

Memories of teh tarik.

Memories of teh tarik.

Rooms that were used by logistics companies at the former station - these possibly will be converted for use by F&B or retail outlets in the future.

Rooms that were used by freight forwarders at the former station – these possibly will be converted for use by F&B or retail outlets in the future.

Another look into a freight forwarders' storeroom.

Another look into a freight forwarders’ storeroom.

A booth. Last used by the auxiliary police at the station, the booth had in its early days, been used by the convenience shop that operated at the station.

A booth. Last used by the auxiliary police at the station, the booth had in its early days, been used by the convenience shop that operated at the station.

The inside of the former ticketing booth.

The inside of the former ticketing booth.

Beautiful soft light illuminates some of the rooms along the main hall.

Beautiful soft light illuminates some of the rooms along the main hall.

A part of the platforms where one could watch the world go slowly by over a cup of teh tarik in the station's last days.

A part of the platforms where one could watch the world go slowly by over a cup of teh tarik in the station’s last days.

Another view of the main hall. There are lots of stories related to the haunting of the third level (section under the letters FMSR at the far end), used previously by the Station Hotel.

Another view of the main hall. There are lots of stories related to the haunting of the third level (section under the letters FMSR at the far end), used previously by the Station Hotel.

The main hall of the station. Part of the vaulted ceiling and batik-style mosaic panels can be seen.

The clutter of the main hall in the station’s last days.

The crowd at Tanjong Pagar late on 30 June 2011 to witness the departure of the last train.

The crowd witnessing Tanjong Pagar’s last moments as a station late on 30 June 2011.

Last journeys.

A final glance at the main hall.

A final glance at the main hall.


A look back at Tanjong Pagar Railway Station

Gazetted as a National Monument in its final days as the southern terminal of the Malayan Raliway, the former Tanjong Pagar Railway Station was built in 1932 as a centrepiece that would underline Singapore’s growing importance as an economic centre in the British Far East. Its position was carefully considered for its envisaged role as a gateway from the southernmost point in continental Asia to the Pacific and Indian Oceans.

Sir Cecil Clementi the Governor of Singapore, in his address at the station’s opening on 2 May 1932, made the observation that it was “a natural junction between land-borne and sea-borne traffic”, adding that it was “where every facility will be afforded for interchange between railway and ocean shipping”.

It was a promise that was not to be fulfilled. Sir Cecil could not have predicted that the railway’s importance as a means of transportation in the Malayan peninsula would diminish and just a little over 79 years since the 5.1.5 pm arrival of the first train from Bukit Panjang Station, the whistle of the last train to depart was heard late into the night of 30 June 2011. An agreement between the governments of Singapore and Malaysia (who through the administration of the railway, also owned the station and the land on which the railway operated through Ordinance 22 of 1918 or the Singapore Railway Transfer Ordinance 1918), which had taken two decades to sort out, saw to the move of the railway’s terminal to Woodlands and with that the transfer ownership  the station and much of the railway land on the island to the Singapore government on 1 July 2011.

Since its closure, the station fell into disuse with the odd event held in the space, and in more recent times, a series of open houses held during public holidays. The location of the former station in what will become the Greater Southern Waterfront has put permanent plans for it on hold. A concept plan for an interim use is however being developed as part of the Rail Corridor RFP by a team led by MKPL Architects and landscape designers Turenscape International. An MRT station for the final stretch of the Circle Line is also being constructed under a section of the platforms, together with the line being run under the station. The work being carried out means that the former station closed to the public for a substantial period of time with the completion of the MRT scheduled for 2025.

The station found use after its closure as a temporary event space.

The station found use after its closure as an event space.

JeromeLim-0153

The rush by the staff at the station to leave on the last train at the end of the final day of operations.

The final journey on the Malayan Railway on 30 June 2011.

A final journey on the Malayan Railway on 30 June 2011.

A few former food stall operators having a last breakfast on 30 June 2011.

A last breakfast on 30 June 2011.

A reflection on the convenience store and the main hall in the last days.

The hardworking last Station Master at Tanjong Pagar - En. Ayub.

The very hardworking last Station Master at the station, En. Ayub.

JeromeLim-0647

The arrival platform with its meal time crowd.

JeromeLim-8072

Coming home.

Returning home, one of the first things that would greet you (post mid 1998) as you walked to the end of the platform was the barrier before you got into the public area. Prior to the move of the SIngapore CIQ, you would first have to pass through Singapore Immigration, Customs and a narrow passage through a fenced area where K9 unit dogs would sniff passengers for smuggled narcotics.

The welcome. One of the first things that would greet passengers after mid 1998 when the Singapore CIQ was relocated to Woodlands. Prior to the move, it would have been necessary to pass through Singapore Immigration, Customs and a narrow fenced passageway where dogs (behind the fence) would sniff passengers for narcotics.

JeromeLim-0289

The wait for a loved one.

JeromeLim-0270

Watching the world go slowly by over a cup of teh tarik.

Tickets would be checked and punched at the departure gate.

The departure gate.

JeromeLim-0299

Leaving on the 8am.

JeromeLim-9308

The walk to Spooner Road.

JeromeLim-9306

Platform end.

JeromeLim-9304

Saying goodbye.

JeromeLim-9759

A welcome home.

A very helpful ticketing clerk, En. Azmi, who was posted to the station on 1st July 1990. He completed a full 21 years at the station when it ceased operations on 30th June 2011.

The very friendly En. Azmi. He was posted to the station on 1st July 1990 and completed a full 21 years of service at the station when it ceased operations on 30th June 2011.

Mr Mahmoodul Hasan who ran the two canteens in the station before its closure.

Mr Mahmoodul Hasan, the M. Hasan in the name of the station’s makan place. He ran the station’s two canteens before its closure.

And last of all one that should not be forgotten - one of the many cats the station was home to.

Catwalk – one of the many cats the station played host to.

The platforms were constructed in a modular manner and LTA is looking at removing the platforms in way of the excavation site in sections and reinstating them.

A view down the platform.

The ticket counter in quieter days - well before the madness of the last two months descended on the station.

The ticketing counter.

Especially when the ticketing computer is down - that in my experience often happened.

An all too common occurrence at the ticketing counter.

A train at the platform.

The last Eastern and Oriental Express train to depart.

Some of those who assisted him at the drinks counter and the popular Ramly Burger stand.

The Ramly Burger stand. Food was one of the draws of the station.

By 12.45 pm, the Briyani had been sold out, brining to an end a chapter for Ali Nacha at the Tanjong Pagar Railway Station.

The day the music died. 12.45 pm on 24 June 2011, when the last plate of Briyani from the popular Ali Nacha stall at the Tanjong Pagar Railway Station was served.

The arrival.

The arrival.

The festive crowd - when queues formed for tickets in the lead up to Chinese New Year. Many with roots in Malaysian would return by train to their home towns for the important holiday (photo source: National Archives online)

The festive crowd – when queues formed for tickets in the lead up to Chinese New Year. Many with roots in Malaysian would return by train to their home towns for the important holiday (photo source: National Archives online).

The main vaulted hall of the station in its early days. An impressive integration of public

The main hall of the station in its early days. The station was built in 1932 to serve as a gateway to the oceans, through the wharves at Tanjong Pagar.  Its opening on 2 May 1932 was marked by the 5.15 pm arrival of a train from Bukit Panjang. The first the public saw of it however, was several months prior to this, when it was used for a Manufacturer’s Exhibition in January 1932.


Advertisements




A new journey through Tanjong Pagar begins

18 03 2015

Close to four years since the close of the railway that ran through Singapore, the  much anticipated Request for Proposal (RFP) for the Rail Corridor is finally out – announced at 11 am today. Key highlights of the RFP include the submission of a Concept Master Plan and Concept Proposals. This will require the development of concept designs for four key activity nodes and two special interest areas, one of which is Tanjong Pagar Railway Station, which involves a proposal for its reuse as a community space for a period 20 years until the port is moved out.  Also noteworthy is the identification of the Kranji MRT area as a northern gateway, which I understand will also involve a realignment of the rail corridor in the area. More information on the RFP can be found in the press release which is appended and at t http://ura.sg/railrfp.

We waved goodbye to the Malayan Railway trains through Singapore close to 4 years ago on 30 June 2011.

We waved goodbye to the Malayan Railway trains through Singapore close to 4 years ago on 30 June 2011.

Bukit Timah Railway Station, one of four activity nodes for which concept designs are to be proposed.

Bukit Timah Railway Station, one of four activity nodes for which concept designs are to be proposed.


NEWS RELEASE BY THE URBAN REDEVELOPMENT AUTHORITY

URA LAUNCHES REQUEST FOR PROPOSAL FOR THE RAIL CORRIDOR

Input from the community to crystallise Concept Master Plan and Concept Proposals

18 March 2015 – The Urban Redevelopment Authority (URA) launched the ‘Rail Corridor – An Inspired and Extraordinary Community Space’ Request for Proposal (RFP) today, inviting design professionals to develop a Concept Master Plan and Concept Proposals for Singapore’s Rail Corridor.

The Rail Corridor: A unique community space of exceptional possibilities

The 24 km-long Rail Corridor spans north to south of Singapore. It threads through diverse landscapes such as housing, business, industrial, and recreational areas, and key landmarks that are rich in nature and heritage. See Annex A for the current uses along the Rail Corridor.

Over the past three-and-a-half years, the URA has engaged different segments of the community extensively through various platforms to gather feedback on their aspirations for the Rail Corridor. The URA has taken on-board the community’s input and distilled them into a set of Planning and Design Goals that now forms part of the RFP brief, to guide participating teams’ proposals for the Rail Corridor. See Annex B for this set of goals.

Mr Ng Lang, Chief Executive Officer of the URA, said, “The return of the former railway land presented a unique opportunity for us to shape the future of the Rail Corridor and its surrounding areas together with the community. The Corridor has the potential to become an extraordinary cross-island green artery and an inclusive community space that provides an exceptional experience for Singaporeans from all walks of life. We have taken the time to engage the community widely, and their input will now guide the development of the RFP proposals. Our intention is to continue to sensitively stage the development of this project with the community, and not rush into developing the whole stretch at one go.”

The RFP will be looking for design professionals to develop an overall Concept Master Plan and Concept Proposals for the Rail Corridor. The proposals should have nature and greenery, celebration of heritage, and connectivity as hallmarks of the Rail Corridor experience. They should be sensitive to the local context so that the Rail Corridor will become more accessible and comfortable for the wider community to enjoy. Retaining and enriching the signature ‘green corridor’ experience is also one of the key requirements. In addition, the proposals must be robust to accommodate the evolving needs of the community.

The RPF calls for an overall Concept Master Plan and Concept Proposals for the Rail Corridor. These include concept designs for four key activity nodes as well as smaller community nodes. There will also be Concept Designs for two special interest areas.

(1) The Concept Master Plan and Concept Proposals should create a unique and endearing Rail Corridor experience. The Concept Master Plan should be embedded with a strong identity and clear design approach that includes proposals for a community connector, amenities, and programming for community use. It should also include landscape, heritage and urban design strategies. Teams should also propose innovative design strategies to sensitively integrate developments with nature and greenery along the Rail Corridor. In addition, participating teams are to propose creative concept designs for four key activity nodes along the Corridor that can support a range of activities, namely:

(i) Buona Vista (near one-north)

This can become a vibrant community space for the nearby business park and research community, as well as residents of the Queenstown neighbourhood. Its design should consider integrating the Rail Corridor with surrounding developments using appropriate urban design strategies. As it is located next to the Buona Vista MRT interchange station and is easily accessible by the public, the space could be designed to accommodate mass activities and events. Formerly the site of the Tanglin Halt Railway Station, teams can also look at recapturing the railway heritage of the area in a creative way.

(ii) Bukit Timah Railway Station area

This is the green heart of the Rail Corridor. This midway point of the Corridor can become its green gateway with supporting visitor facilities. The planning and design of this node should be complementary to its idyllic natural setting anchored by the conserved Bukit Timah Railway Station. The Station itself should be repurposed for uses that complements the vision for this node. This is where occasional community events can be held. At most other times, it can be a place of retreat and where one can enjoy the serene, green landscape.

(iii) Former Bukit Timah Fire Station

The former Bukit Timah Fire Station and quarters will become a new gateway into the Rail Corridor. A new pedestrian link will be provided from the Fire Station site directly into the Rail Corridor where visitors could explore the parks fringing the Bukit Timah Nature Reserve such as Dairy Farm Nature Park and Bukit Batok Nature Park. The buildings within the Fire Station site will be retained and should be repurposed for uses that complement its function as a gateway into the Rail Corridor.

There could also be suitable linkages from the former Fire Station to nearby heritage sites such as the Old Ford Factory and site of the Battle of Bukit Timah, which are steeped in World War 2 history.

(iv) Kranji (opposite Kranji MRT Station)

This is envisioned to become the northern gateway into the Rail Corridor. Located across from the Kranji MRT station, it is highly accessible as a major gathering place for the community to hold events and start the journey south towards the city. Its design should complement and be sensitive to key landmarks in the area such as the Singapore Turf Club, Kranji War Memorial, and Mandai Mangroves.

The successful team for the Concept Master Plan will also be required to carry out a preliminary design for a selected 4 km signature stretch of the Rail Corridor. More details of this selected stretch will be provided to shortlisted teams.

(2) Special interest area 1: Concept Designs for the adaptive reuse of the former Tanjong Pagar Railway Station.

This National Monument located at the edge of the city will become the most prominent and important gateway into the Rail Corridor. Participating teams should consider how the former Tanjong Pagar Railway Station can be put to adaptive reuse as a community building for the next 20 years, pending the development of the Greater Southern Waterfront. They are to propose suitable uses that will give the building a new lease of life. The space should allow for multi-functional community activities that supports its position as the anchor node into the Rail Corridor. The public should have unfettered access so that they can appreciate the heritage of this building and its surroundings.

(3) Special interest area 2: Concept Designs for an urban-green-blue tapestry at Choa Chu Kang

The stretch of the Rail Corridor at Choa Chu Kang that is adjacent to the Sungei Pang Sua Canal provides an opportunity to weave a unique urban-green-blue tapestry in the precinct. Currently, that stretch has low plant biodiversity, while the Sungei Pang Sua is fully canalised. Participating teams are to come up with innovative design concepts to enhance and integrate that segment of the Rail Corridor with Sungei Pang Sua to create an ecologically richer and more vibrant natural environment, and merge it seamlessly with future housing design in the area.

See Annex C which highlights the Rail Corridor, the four key activity nodes, and the two special interest areas.

Request for Proposal process

The RFP exercise comprises a 2-stage Tender Selection Process. Participating teams’ submissions will be assessed by a distinguished 11-member Evaluation Panel. Collectively, the panel members have deep and extensive experience and knowledge in urban planning and design, architecture, landscape architecture, building heritage, nature conservation, sustainable development, and park management. See Annex D for details of the RFP process and Annex E for the list of Evaluation Panel members.

The successful team(s) of consultants will be announced in October 2015. There will be a public exhibition of all shortlisted submissions from October to December 2015.

Continued community involvement

To ensure that the Rail Corridor lives up to its vision as an outstanding and inclusive public space for the community, the URA will continue to engage the community to gather further feedback on the proposals during the public exhibition. Following that, URA will work closely with the consultant(s) to refine the awarded Concept Master Plan and Concept Proposals, taking into account the public’s input.

The implementation will be studied carefully, taking into consideration various factors including the broader development plans for surrounding areas, the laying of underground services below the Rail Corridor, and the needs and aspirations of the community.

More information on the RFP exercise is available at http://ura.sg/railrfp.






The long and not so winding trek down a route less travelled

11 07 2011

I was one in that crowd that had gathered in a car park of Silat Estate early on a Saturday morning for what was to be a trek that did seem along parts of the trek to a bridge that was a little too far. Despite a start at a time of day when most would be catching up on their slumber, the trek which was led by Ministor of State for National Development BG Tan Chuan-Jin had attracted a sizable group of participants that included the good folks behind the proposal to retain the former railway land as a continuous green corridor, members of the Ministry of National Development (MND) and the Urban Redevelopment Authority (URA) teams, plus many more who came in a show of support for the green corridor proposal.

The early Saturday morning trek started at Silat Estate and for most ended 13.6 kilometres later at the truss bridge at the Rail Mall - one of the bridges that will be retained. BG Tan (in blue) continued one his trek with some members of the NSS to Kranji after a pit stop at the Rail Mall.

Silat Estate is the southernmost point at which the tracks are accessible with the stretch leading into the former Tanjong Pagar Railway Station and the Kampong Bahru train yard beyond the Kampong Bahru flyover closed to the public, and trekking along the corridor from that point up some 23 kilometres to Kranji (which BG Tan did), gives many of us the opportunity to take a pedestrian’s glance at a part of Singapore that was left largely unseen for a better part of a century save for the view one got of it from the speeding train. It is a part of Singapore that many who have their interactions with the more accessible parts of it, hold dearly in their hearts … bringing many back to a time when Singapore had a less built-up feel to it. For many like me, the railway land will always have a place in my memories for several reasons. There are many parts of Singapore that I will always associate with the railway – one being the Bukit Timah and Bukit Panjang areas where I had my first encounters with trains through the bridges and crossings that have given the area a unique character.

Ghostly figures in the dark ... the group setting off on the trek at the set of tracks close to Silat Estate at 6.25 am.

First light under a road bridge at Henderson Road.

The trek provided me an with opportunity to have a good look at some of the less accessible parts of the railway track before that is gone forever, having seen much of the areas south of the Tanglin Halt area previously only from the window of the train. It was not just for me a final chance to do so, but also to hear first hand from BG Tan and his team on the plans the MND had for the railway land. I was pleased to find that the Minister of State was friendly and approachable and certainly very forthcoming in explaining the considerations that the MND would be taking in planning for the use of the land. Throughout the trek, despite the rapid pace at which he moved down the tracks – he stopped slowed down to talk to participants as well as passers-by and also take quite a number of photographs himself, as well as finding the time to show that he has a sense of humour – remarking that there were quite a number of “lost soles” that we encountered along the way.

The trek provided me with an opportunity to have a good look at some of the less accessible parts of the railway track before that is gone forever.

The tracks near Alexandra Road.

A particularly green stretch near the former Alexandra Halt ....

Among the things that I was able to find out from the brief encounters with BG Tan that the trek afforded, was that there were as yet no specific plans for the redevelopment of many parts of the former railway land as yet. There are some though that will soon go ahead, as was mentioned by Mr George Yeo in a speech he made in his capacity as Foreign Minister during the budget debate in March of this year in which he made mention of plans in place for the development of Silat Estate and the expansion of the One North Business Park commencing from 1st July (see Straits Times report dated 4 March 2011). Even with this, BG Tan felt that the opportunity was there to integrate the idea of the green corridor into the redevelopment of the former railway land was certainly there. There also are no specific plans as yet for Tanjong Pagar Railway Station and Bukit Timah Railway Station which many would like to see use of which would make it more accessible to members of the public than what we have seen with a few other National Monuments and Conserved Buildings. One thing that was significant that did come out was that there were indeed considerations for what is termed as a “green spine” – which was mentioned on the day of the walk by the Minister for National Development Mr Khaw Boon Wan in his blog post “A Green Opportunity“, which was consistent with what BG Tan had mentioned and he did go on to mention that the MND would certainly be consulting NGOs and other interested parties, as well as obtaining feedback from the public as it draws up its plans (which he was keen to stress may take several years) for the use of the new found space, at the same time moderating expectations by saying that in an ideal world we could preserve much of what we see as it is, but in a land scarce Singapore, some balance was needed although the green spine idea was very much in their minds.

BG Tan catching up with the head of the group after spending some time to chat with participants and taking a few photographs along the way.

A couple holding hands under the AYE slip road out to Alexandra Road ...

The area around Jalan Hang Jebat.

The same couple ... they held hands all the way ...

Scenes of old Singapore on the approach to the Queenstown area.

More scenes of old Singapore on the approach to the Queenstown area.

One of the ideas put forward by the Nature Society (Singapore) or NSS which is fronting the green corridor proposal is the retention of the tracks and sleepers – something which we will unfortunately not see. This, BG Tan stressed was something that the authorities on the Malaysian end wanted to have returned to them. And while that and a few girder bridges (the ones at Hillview Road, near Ten Mile Junction and close to Kranji Loop) along the length of the tracks will very quickly disappear – these have to be returned by by 31st December this year, we will see the two black truss bridges over the Bukit Timah area and the girder bridge at Hindhede Drive retained, along with the one over the Sungei Ulu Pandan north of Clementi estate that was part of the Jurong Line retained.

Joggers along the track near Tanglin Halt.

What used to be a popular shortcut at Commonwealth Drive which is still very much used.

Songbird cages at Commonwealth Drive.

Graffiti on the walls of an abandoned KTM building at Tanglin Halt ... another part of Singapore we don't normally see.

Under the road bridge at Commonwealth Avenue.

The group heading out towards the Ghim Moh / Mount Sinai area.

Ghim Moh area.

While the removal of the tracks is perhaps unfortunate from a heritage perspective – for one Bukit Timah Station would certainly lose its character and part of its heritage
without the tracks and in particular the loop lines (a lot has already been lost as the historical equipment and most of the signal levers have already been returned to KTM), there are encouraging signs that the bulk of the green corridor proposal is being considered along with the intention of the MND to consult NGOs and other stakeholders, as well as obtain feedback from the public. The willingness to engage is also made very obvious from Saturday’s trek which wasn’t just for the invited few but opened to one and all that for many ended at what had seemed like a bridge too far near the Rail Mall. With a few brave hearts BG Tan set off for the remaining 10 kilometres of his trek up to Kranji finishing it some 3 hours later, and what was left was hope that the the greener and softer Singapore which many seek is possibly one that will take a raod less travelled and one that perhaps would lead to a bridge that isn’t too far …

Through the first of two Holland Road road bridges.

A human train seen at the Clementi Road woodland near Holland Green.

Cyclists seen crossing an obstacle in the midst of the lush greenery at the Clementi Raod woodland.

The media interviewing BG Tan at Bukit Timah Station.

BG Tan posing with a family at Bukit Timah Station.

All that's left of the signal levers at Bukit Timah Station.

The now fenced up Bukit Timah Station - many hope that the building would remain accessible whatever the plans are for it.

Continuing on the 3 kilometre stretch that will remain open up to the 31st of July.

Towards a very green area that borders the nature reserve at Bukit Timah. One of the thoughts in th green corridor proposal is to allow an uninterrupted green corridor to allow the passage of flora and fauna from the reserve to the southern ridges.


The Green Corridor:

The Green Corridor is an idea that is mooted by the Nature Society (Singapore) (NSS) to keep the railway corridor which extends through much of Singapore as a continuous green corridor, one that the railway has allowed thrive amidst the wave of urbanisation that has swept across much of the Singapore that the railway corridor runs through. A proposal was submitted to the Government of Singapore last October in which the NSS proposes that the corridor be allowed to be retained once railway operations through Singapore stops with the shifting of the terminal station of the Keretapi Tanah Melayu (KTM) in Singapore, to Woodlands. The idea also extends to the disused Jurong extension, part of which is currently under threat from the construction of a new road in the Faber Heights area near Clementi.

The NSS’ proposal can be found at this link. More information on the Green Corridor can also be found at The Green Corridor (website). You can also show your support for the Green Corridor by “liking” the We Support the Green Corridor Facebook Page.


This slideshow requires JavaScript.


Public feedback sought:

The URA welcomes feedback and ideas from the community in shaping the future development plans for the railway lands. The members of the public are invited to visit and provide their ideas at www.ura.gov.sg/railcorridor/.






Lend your support to the Green Corridor – take a walk with the Minister of State (National Development)

8 07 2011

In a note on his Facebook Page, the Minister of State for National Development, BG Tan Chuan-Jin, revealed his plan to walk along the entire length of the former railway corridor from Tanjong Pagar Railway Station to Woodlands with “friends who feel passionately about this piece of land and the life around it” and has apparently invited members of the public to join him on his walk. He will commence his walk at 6am from the area of the tracks just by the Silat Estate area and in his note indicates some possible timings. This provides a wonderful opportunity for all who feel passionately about retaining what is now the former railway corridor as a continuous Green Corridor through Singapore that is accessible to everyone, to let yourselves be seen and have your voices heard. Do join the walk or parts of the walk with the Minister of State if you have the time. Based on information provided on the Facebook note, the schedule for the walk is as follows:

The walk is scheduled for Saturday 9 July 2011.

6.00am Silat Estate: Starts trek at Silat Estate [please click for map]
6.30am Should commence after hanging around and sorting ourselves out.
9.00am (6km from Start Pt): Reach Buona Vista MRT
10.30am (10.8km from Start Pt): Reach Bt Timah Railway Station
12.30am (13.6km from Start Pt): Reach Rail Mall
1.30pm Proceed with rest of the trek along the corridor
7.00pm End at Kranji Road (23km from start point). Easier access from here to exit.

To obtain updates directly from the BG Tan Chuan-Jin, do follow his twitter feed @chuanjin1.

I will also be tweeting as we go along, so do follow @JeromeKG on twitter to receive updates on the walk.

Join the MOS(ND) on a walk through the railway corridor to lend your support to the Green Corridor proposal this Saturday.


The Green Corridor:

The Green Corridor is an idea that is mooted by the Nature Society (Singapore) (NSS) to keep the railway corridor which extends through much of Singapore as a continuous green corridor, one that the railway has allowed thrive amidst the wave of urbanisation that has swept across much of the Singapore that the railway corridor runs through. A proposal was submitted to the Government of Singapore last October in which the NSS proposes that the corridor be allowed to be retained once railway operations through Singapore stops with the shifting of the terminal station of the Keretapi Tanah Melayu (KTM) in Singapore, to Woodlands. The idea also extends to the disused Jurong extension, part of which is currently under threat from the construction of a new road in the Faber Heights area near Clementi.

The NSS’ proposal can be found at this link. More information on the Green Corridor can also be found at The Green Corridor (website). You can also show your support for the Green Corridor by “liking” the We Support the Green Corridor Facebook Page.






The gateway to the oceans that lay beyond our shores

1 07 2011

Camouflaged in vegetation close to the former railway station at Tanjong Pagar, is a forgotten structure that perhaps reminds us of why the southern terminal station of the Federated Malay States Railway (FMSR) was relocated to Tanjong Pagar in 1932. The station was as many know, built to serve an important function as Asia’s and possibly Europe’s gateway to the Pacific and Indian oceans that lay beyond our shores. While the railway that was to link Asia with the extensive European railway network didn’t quite materialise, the Malayan Railway’s southern terminal still served as an important link for goods from the peninsula to be exported though the nearby docks at Tanjong Pagar, right up until the 1960s.

A turnbuckle for the tension wires supporting the gate.

A stop sign on the gate stands out in the vegetation.

Speaking to an elderly gentleman whom I met at the station and who was kind enough to show me to the gate to the docks, I was to learn that the last the gate was used was back in 1965, some 46 years ago. He remembers that there was a crossing across what was a narrow Keppel Road then, on which the train crossed close to where Tanjong Pagar Railway Station is right into the gate to the docks. With the closure of the station, which has been gazetted as a National Monument as of the 1st of July, I hope that the gate would also be kept – to remind us of why the station had been placed at where it was at Tanjong Pagar.

A post for the gate to the docks seen through the vegetation.

A view of the gate that reminds us of the purpose for which the railway station was sited at Tanjong Pagar.