The Jacksons of Sembawang

30 07 2019

Sembawang is one of just a few places in Singapore in which still holds the charm of a bygone era. The modern world, dominated by the sea of concrete is however, knocking increasing at its door; its latest convert being the the wonderful settings that lent context to (old) Admiralty House. The National Monument, built as the home of Commander of the huge British naval base in 1940, has seen the isolation it was provided with taken away in the effort to provide residents in the area with a sports and community hub. Similarly threatened with modernisation is the area by the coast just east of Sembawang Park and once an area of idyllic seaside villages where the villages of the new world have started to take root. One project that quite thankfully bucks the trend is the recently announced dementia-care village at Gibraltar Crescent. Currently the subject of a URA tender exercise, the village will make use of existing structures inherited from the days of the naval base and (hopefully) preserve some of the environment that the structures now find themselves in – at least for a 30-year period following the award of the tender.

A window into the past.

A quiet area of seemingly typical colonial residences,  a closer examination of the buildings of Gibraltar Crescent will reveal that they are actually quite unique even if they bear quite a fair bit of resemblance to and have many of the features of the residences that have come to be described as “black and white houses”. With the exception of a building that served as the former Dockyard Theatre or the “Japanese Theatre”, the longer than typical structures are raised on concrete columns of a height sufficient to permit a person to walk comfortably underneath the floorboards. Wood is also the main material on the buildings and masonry seems to have been used quite sparingly and used, besides in the supporting columns, in wet areas and in the ground level service structures. Quite interesting because of the wood featured in the buildings’ exterior walls, the structures tended to look more black than white in the days of the naval base as black bituminous paints that weatherproofed the wood.

A view towards the former Dockyard Theatre – a uniquely built structure along Gibraltar Crescent. It is the only large building along the street that is not raised on columns.

There are quite good reasons for the features adopted in the buildings, which were among the first to be erected by the contractor for the naval base, Sir John Jackson & Co, for the purposes of housing its European staff. Known as The “Jacksons” for this reason, they were completed in mid-1929. Features found in other “black and whites”, such as the raised supports, generous verandahs and openings, pitched roofs and wooden floorboards, kept the interiors cool, airy and bright. Although now among the oldest “permanent” residences in the former naval base, as well as being the first to have been purpose built, the buildings were intended as quasi-permanent residences and hence the extensive use of wood.

The Jacksons are raised on concrete supports and feature wooden walls except in the service areas and wet spaces.

Two “Jacksons” under construction in April 1929 (online at National Archives of Singapore).

It is also interesting to note how the various residences, while similar in appearance, have been laid out in what seems to be two distinct arrangements. One type seems to have had more of a layout with more common spaces and was perhaps used to house the lower ranking staff. This design has a centrally arranged service area and besides the access staircases at the back has two arranged at each end in the buildings’ front. The other design seems to have been subdivided into individual units, each with a service area and with what appears to have been an access staircase at both the front and the back.

A unit with a layout that lends itself to a more dorm-like use.

A Jackson which would have been subdivided into three individual units – each with its own service area.

Reports relating to the construction of the base, point to it being one of the largest engineering projects in the world at the time. The contractor employed a daily average of 3,000 coolies and had at least 30 European staff at any one point supervising through the 8 year period (from 1928 to 1936) over which the main contract was executed. The reports point to some 23 residences were built for European staff, along with numerous coolie lines. The residences were eventually handed over the the Admiralty and several among the 23 survived including the structures that are now the subject of the tender survived the war.

The front of one of the Jacksons with projections that would have served as staircase landings.

An exception may have been the Dockyard Theatre, the site of which, based on older maps seems to have been occupied by another of the “Jacksons”. Thought to have been constructed during the occupation – hence the references to it as the “Japanese Theatre” – the multi-use hall is built on a ground-level platform of concrete and is also built primarily of wood. The theatre was used as a to hold live performances including pantomimes and performances by the Naval Base Singers, as well as serving as a hall in which badminton was played in the period after the war until the British pull-out in 1971.

One of two access staircases at the rear in the first type of residence.

The verandah of the second type with privacy screens at what would have been the boundaries of the individual units.

Inside one of the residences.

Inside one of the residences.

Inside one of the residences. 


News related to the tender for the dementia care village:


 

 

 

 

 

 

 

 

 

Advertisements




The Quadrant, built as a temporary Oversea Chinese Bank HQ

2 12 2018

There has been much mystery over the origins of The Quadrant at 19 Cecil Street. Identified in Gretchen Liu’s wonderful compilation of images charting Singapore’s progress over the year’s, Singapore: A Pictorial History 1819-2000, as having been built for the Kwangtung Provincial Bank, it turns out that it was for another Chinese bank – the Oversea Chinese Bank – for which it was erected for.

The Quadrant

Built in 1928/29 and designed by Keys and Dowdeswell, the motivation for the construction of the quadrant shaped Art Deco building – in an area that wasn’t considered by the directors of the bank to have been in a “not quite central” location – was the need to search for temporary premises. The bank’s HQ at 62-63 Chulia Street was affected by the implementation of the 1909 amendment to the Municipal Ordinance known as the “Back Lane Scheme” (more on the scheme: Off a little street in Singapore), which effectively cut its premises into half.

As the Kwangtung Provincial Bank, 1939 to 1979.

Rather than invest time and effort to seek new premises, the bank decided instead to erect a new building on a site at the corner of Cecil and Market Streets occupied by 6 three-storey shophouses they had acquired. The bank felt that the building – even if there were no plans to use it once a more central location (closer to the hub of commercial activity by the Singapore River) was found – was a “good investment”. The bank moved out once its permanent premises at China Building in Chulia Street (current site of OCBC Centre), which was co-developed and shared with Chinese Commercial Bank, was completed in late 1931. The two banks together with Ho Hong Bank merged in 1932 in the face of the Great Depression under the Oversea-Chinese Banking Corporation (OCBC) banner and China Building became OCBC’s HQ.

China Building, completed in 1931.

The temporary HQ was occupied by wine merchants, Eastern Agencies from 1933 to 1938, the Kwangtung Provincial Bank from 1939 to 1979 and Four Seas Communications Bank from 1982 to 1990 (which was already part of the OCBC group by that time). Pacific Can, when the building was renamed Pacific Can Building, occupied it from around the early 1990s to the 2000s, by which time I have been advised it had come into the hands of the State. Other occupants were Cherie Hearts – a childcare group, and then the Homestead Group, , which has a lease on it until 2021. The group had planned to lease the premises out to a bank, but despite much interest, the economic put paid to the idea and instead has sub-let out the lower level of the building to The Black Swan. The grand banking hall the building was given is still very much in evidence in the gorgeously decorated bar and bistro – almost three decades since it was last used as a bank.

The Black Swan.

Stairway to the gallery (mezzanine).

Also in evidence at the rear section of the 20 feet high banking hall is an upper level “gallery” from which the bank’s managers could have a view of what went on below, which the bistro uses as a cocktail bar, The Powder Room. There is also a private dining area located in the former vault.

The former banking hall – seen during yesterday’s Discovering Singapore’s Best Kept Secrets.

The Powder Room.

The former bank vault.

The upper levels of the building – access to which is through a beautifully built stairwell where a rebuilt 1929 vintage Marryat and Scott elevator is installed – is occupied by a co-working space run by WOTSO.

The stairwell.

Some of the lift’s original mechanism.

WOTSO’s co-working spaces on the upper levels.

 

Another view of the Powder Room.


The visit to The Quadrant was organised on 1 December 2018 as part of the Discovering Singapore’s Best Kept Secrets series of State Property Visits, supported by the Singapore Land Authority, the Homestead Group, The Black Swan and WOTSO.


 





Dark clouds on the northern horizon

8 10 2018

I have long thought of the Sembawang area as a final frontier, and a last part of modern Singapore in which much of yesterday remains to be discovered. Progress is however eating away at these remnants of a soon to be forgotten time; the latest bit of Sembawang being absorbed into the brave new world is the area’s last forested hill on which the grand Admiralty House is perched. Now with almost the entire western slope of the hill denuded, the settings that provided the house with its charm and also its much needed isolation for its eight decades of existence, will never again be the same.

Dark clouds on a northern horizon … the denuded western slope of the last forested hill in Sembawang.

Completed in 1940, the house with its distinctive Arts and Crafts inspired flavour, was built as the residence of the Rear Admiral, Malaya. Its scale and appearance would have been most fitting to house the  commander of the then newly opened Naval Base – the largest and most important of Britain’s bases east of the Suez. It would only acquire the name best known to most, Admiralty House, when it became the residence of the Commander-in-Chief of the Royal Navy’s Far East Station in 1958.

Another view showing the extent of the clearance on the western slope.

Handed over to the Singapore Government in 1975 after a spell as the residence of the Commander of the ANZUK Force, the house – and the hill has since resisted the advance of concrete that has seen a new HDB town sprout up around it. Time was finally called on the hill when plans for a sports and community hub surfaced in the 2014 Master Plan. At the project’s launch in 2016, an announcement was made that some 200 of the hill’s mature trees, just over a quarter of the existing trees, would be retained – with a greater number of new trees planted. While this may be the case – even with most of the hill’s western slope now stripped bare – the terracing necessary for the project and the construction of new structures and footpaths, will permanently alter the hill’s character and add much unwelcome concrete to an already heavily concretised area.</p?

The still forested hill, seen in July 2016.

The hub, which will feature a food centre, a swimming complex, other sports and recreational facilities, is due to be opened in phases from the first half of 2020. It will eventually incorporate the former Admiralty House, a National Monument since 2002. Work on this phase will commence when Furen International School, vacates the house in 2020.

Another view of the hill in 2016.

More on the hub and the former Admiralty House can be found at:


The front of the former Admiralty House.

The house has been likened to an English country manor.

The view the house commanded until fairly recently.


 





Discovering 10 Hyderabad Road

20 07 2018

Update (20 Jul 2018, 12.30 pm)

Registration has closed as all 40 slots have been taken up. Do look out for the next visit in the series – registration will open on a Friday two weeks before the visit date.  More information at Discovering Singapore’s Best Kept Secrets is back.


The third visit in the 2018 “Discovering Singapore’s Best Kept Secrets” series of State Property Visits, which the Singapore Land Authority is supporting, is to No. 10 Hyderabad Road. The property, which is now wonderfully repurposed as the Singapore campus of the S P Jain School of Global Management (who are also hosting and supporting the visit), features a set of buildings that may seem vaguely familiar to some. The buildings, the oldest on the campus, feature tropicalised classical façades and can be found replicated across several former British military camps across Singapore dating back to the 1930s. Built as officers’ messes as part of the wave of military barracks upgrading and construction works of the era, this one at Hyderabad Road was put up for the same purpose by the officers of Gillman Barracks.

The British military pull-out in 1971 saw the building handed over to the Singapore government. The Dental Health Education Unit moved in in 1973 and then the Institute of Dental Health (IDH) – when the Dental Education Unit was incorporated into it in 1975. It was during this time that the campus’ six-storey learning centre and hostel was put up for use as a central facility for the training of dental therapists, nurses, dental assistants and technicians. Outpatient dental health clinics were also set up in the building.

The buildings of the former officers’ mess is now used by S P Jain as an administration building as well as as “hotel” for visiting faculty and features 20 very comfortable rooms as well as a beautifully decorated lounge and banquet hall.  There are also staff rooms, discussion rooms, a music room, a chill-out lounge and a library in the buildings – which participants can hope to see.



Details of the visit and registration link:

Location : 10 Hyderabad Road, Singapore 119579
Date : 4 August 2018
Time : 10 to 11.45 am
Registration : https://goo.gl/forms/goZZravHJk4hDrnx1

Back to Top


More on 10 Hyderabad Road:

More on Discovering Singapore’s Best Kept Secrets:






Beautiful in its abandonment: the red-brick power station at Pasir Panjang

20 06 2017

Photos taken during visit as part of the Singapore Heritage Festival 2018 on 22 April:


There is a certain charm about the utilitarian, red-brick faced ‘A’ power station at Pasir Panjang. Comparable in appearance to the much-loved and now lost National Library at Stamford Road, the former station stands in relative obscurity in a neglected corner of Singapore.

Pasir Panjang ‘A’ Power Station. Commissioned in 1953, it was Singapore’s second power station. Decommisisoned in the early 1980s, it lost its two iconic 235 foot high chimneys in the 1990s.

‘A’ station, completed in 1952-53, acquired the designation ‘A’ when a second or ‘B’ station was added just adjacent to it in 1965. Built at a time when such red-brick faced constructions seemed the fashion, it is evocative of an age at which the foundations for Singapore’s huge transformation were being laid. The elegance that ‘A’ station wears, one that seems to be missing in the form of its nearby and more modern counterpart, belies the fact that the station had been built in desperate circumstances. At the point of its opening, Singapore’s second station, constructed almost three decades after the first, was badly needed due to an acute shortage in electricity supply. St. James, Singapore’s first power station, which had been built with an initial capacity of 2 MW in 1926., was producing a maximum of 37 MW by 1948 (see also Electricity in Singapore). However, by 1950, maximum demand stood at 43.5 MW, and with the supply clearly insufficient, load shedding was introduced. This affected one-third of the electrical consumers in the municipality turned city each night.

The red brick power station and its two 235 feet high chimneys in the early days of the station (online at https://roots.sg/).

‘A’ power station was opened by Governor Sir John Nicoll on 3 July 1953 to great promise. Two of the intended six 25 MW turbo-alternators had been commissioned by then. More were to be added and by 1958, it had reached it intended output of 150 MW – a number that was thought at the planning stage to be sufficient to meet power supply requirements for 20 years. In that time, 260 substations were also built, some 230 kilometres of 22kV distribution cables laid (there also was an upgrade from a 6.6 kV transmission system to a 22 kV one) and 34,700 consumers added. Bulk supply could also provided to Johor Bahru. Power supplied by the station also helped launch Singapore’s big industrial push in the 1960s. With demand already reaching 105.7 MW in at the point of the commissioning of the sixth alternator, an additional 25 kW was added to Pasir Panjang ‘A’ station’s capacity in 1962. With demand increasing,  the construction of a new station, the ‘B’ station, commenced soon after  in 1963.

The former Pasir Panjang ‘B’ Power Station, which was opened in October 1965.

‘B’ station opened with an initial capacity of 120 MW in October 1965, half of its planned capacity of 240 MW. Even this would not be enough to fuel the rapid growth in demand and a new 240 MW power station in Jurong Industrial Estate had to be planned for as the ‘B’ station was taking shape. The commissioning of ‘B’ Station also allowed electrical power supplied to the island of Pulau Bukom from November 1965. Power on the island, where Shell commissioned Singapore’s first refinery in the early 1960s, had to be drawn from the island’s own generating plant prior to this. The opening of the ‘B’ station also saw the transmission system upgraded to 66kV with the existing 22 kV system relegated to a sub-transmission system (the current high voltage transmission network, introduced in 1976, distributes electricity at 230 kV).

Inside the Turbine Hall of the ‘A’ power station (online at National Archives of Singapore Online).

The death knell for the stations was sounded in the late 1970s with more advanced, higher capacity, and cleaner (one common complaint was of soot falling from the sky in the area) power stations such as Senoko and Pulau Seraya being built. ‘A’ station was decommissioned in mid-1980 and ‘B’ in the late 1990s. The stations’ buildings were re-purposed following their decommissioning and are still standing today sans their iconic chimneys. While ‘A’ station is now left vacant, ‘B’ station’s main building is currently in use as the Pasir Panjang District Office of SP PowerGrid Ltd. It is not known what the future holds for the two sets of buildings as the only thing that the URA Master Plan tells us, is that the stations sit on a “reserve site”.

Related:


Note: My visit to the former Pasir Panjang Power Station was made with the kind permission of the Singapore Land Authority.


The abandoned Pasir Panjang ‘A’ Power Station

The cleared out Turbine Hall.

Tall steel columns of the Turbine Hall – part of the metal skeleton of the building.

Reflections on the Turbine Hall.

The building has a generous amount of windows to allow natural light in.

Space under the platform of the Turbine Hall.

Reflections of the skylight in the Turbine Hall.

A steel beam, marked with its origin.

Electricity was distributed at 6. 6 kV before Pasir Panjang was built, when high-voltage transmission was done at 22 kV. The Pasir Panjang generators produced electricity at distribution voltage, and this be fed directly into the transmission network.

Transmission was switched to a higher voltage of 66 kV when the ‘B’ station was completed in 1965 and the 22 kV transmission network was used as a sub-distribution system.

Colour coded fire hydrant.

Stairway to the platform level.

The Boiler Hall.

Steel columns on the platform level.

Another view of the platform level.

Bracing on the steel framework.

Storage tanks for the power station’s oil fired boilers.

A weighbridge.

A last look at the Turbine Hall.


Some ‘B’ station facilities

‘B’ station’s pump house – the cooling plant, originally supplied by Mather and Platt Ltd, could supply 50,000 gallons of water a minute.

Inside the pump house.

Inside the pump house.

The added capacity of the ‘B’ power station permitted the supply of power to Pulau Bukom in Nov 1965. The commissioning to the ‘B’ power station also saw a shift to a 66 kV high voltage distribution network with the 22 kV network relegated to a sub-transmission system.

A room inside the chlorine handling facility.

Inside the chlorine handling facility.


Electricity in Singapore

The use of electricity for the purposes of lighting in Singapore goes back to 1897 when the Tanjong Pagar Dock company introduced electric lighting to its machine shops. It would be some years before the Municipality would adopt electric street lighting, which was introduced to Raffles Place, North Bridge Road and Boat Quay in 1906. This move coincided with the installation of a generator by the Singapore Tramways Company (later Singapore Traction Company) at MacKenzie Road for the purposes of powering its electric trams. Excess electricity distributed via a 460 V D.C. three-wire network, was sold in bulk to the Municipality, who in turn also sold electricity to some 42 consumers. This grew to 110 consumers in the first year and expanded rapidly thereafter.

The generating station at Singapore Tramways Company’s MacKenzie Road depot.

This arrangement went on for some 20 years, with supply also provided by the Singapore Harbour Board from 1924, until the coal fired St. James Power Station was built in 1926. The construction of the station were on the recommendations of a commission appointed by the Municipal Commission. The site at the promontory at St. James was selected due to its location by the coast as well as its proximity to the railway line, which ran to Pasir Panjang. This allowed the coal required to fire the station’s boilers to be delivered either by sea or by rail.





The last forested hill in Sembawang

11 07 2016

Sitting in relative isolation and surrounded by a lush forest of greenery for much of the 76 years of its existence, Old Admiralty House may soon find itself in less than familiar settings. The National Monument, built as a home away from home for the officer in command of the British Admiralty’s largest naval base this side of the Suez, will soon find itself become part of Sembawang’s sports and community hub.

Dawn over a world on which the sun will soon set on. Old Admiralty House in its current isolation on top of a hill, with the fast invading sea of concrete in the background.

The hub, it seems from what’s been said about it, will feature swimming pools, multi-play courts, a hawker centre, a polyclinic and a senior care centre; quite a fair bit of intervention in a quiet, isolated and of late, a welcome patch of green in the area’s fast spreading sea of concrete. Plans for this surfaced during the release of what became the 2014 Master Plan, which saw a revision on the intended location of Sembawang’s sports and recreation complex from the corner of Sembawang Avenue and Sembawang Road to the parcel of land on which the monument stands.

The original intended location of the sports and recreation complex in Sembawang (area shaded in light green) [URA Master Plan 2008].

The original intended location of the sports and recreation complex in Sembawang (area shaded in light green) [URA Master Plan 2008].

The monument, a beautifully designed Arts and Crafts movement inspired house, is without a doubt the grandest of the former base’s senior officers’ residences built across the naval base.  Set apart from the other residences, it occupies well selected position placed atop a hill in the base’s southwestern corner, providing it with an elevation fitting of it,  a necessary degree of isolation and privacy, and the most pleasing of surroundings – all of which will certainly be altered by the hub, notwithstanding the desire to “incorporate the natural environment and heritage of the area”.

A day time view.

A day time view.

The revised location of the sports and recreation complex in Sembawang (area shaded in light green) [URA Master Plan 2014]

The revised location of the sports and recreation complex in Sembawang (area shaded in light green) [URA Master Plan 2014].

The naval base that Old Admiralty House recalls is one to which colonial and post-colonial Singapore owes much economically. With the last working remnants of the base are being dismantled, the area is slowly losing its links to a past that is very much a part of it and Singapore’s history and whatever change the creation of the sports and community hub brings to Old Admiralty House and its settings, it must be done in a way that the monument at the very least maintains its dignity, and not in a way in which it is absorbed into a mess of interventions that will have us forget its worth.

1945 Map Detail

Detail of a 1945 Map of the Naval Base showing the area where ‘Admiralty House’ is. The house is identified as the ‘Admiral Superintendent’s Residence’ in the map.


More on Old Admiralty House: An ‘English country manor’ in Singapore’s north once visited by the Queen


Around Old Admiralty House

The former Admiralty House, likened by some to an English country manor.

The former Admiralty House, likened by some to an English country manor.

The swimming pool said to have been constructed by Japanese POWs.

A swimming pool said to have been constructed by Japanese POWs.

Evidence of the through road seen in an old lamp post. The post is one of three that can be found on the premises.

An old concrete lamp post on the grounds.

What remains of a flagstaff moved in May 1970 from Kranji Wireless Station.

What remains of a flagstaff moved in May 1970 from Kranji Wireless Station.

Inside the bomb shelter.

An air-raid shelter found on the grounds.





Not all Black and White at Mount Pleasant

1 11 2015

In a Singapore now overrun by the clutter of the modernised world, there is nothing that better celebrates the Singapore we have long abandoned better than the “Black and White” houses we still see scattered across the island. Characterised by their whitewashed and black trimmed exteriors and set in lush green surroundings, the houses – built in the early decades of the twentieth century to house the colony’s administrators, carry themselves with a poise and elegance that is sadly lacking in the architecture of the modern world.

The 'black and white' house at 159 Mount Pleasant Road.

The ‘black and white’ house at 159 Mount Pleasant Road.

The rear of the house - with the kitchen and servants quarters arranged in typical fashion behind the main house.

The rear of the house – with the kitchen and servants quarters arranged in typical fashion behind the main house.

I am always grateful for the opportunity to have a look into one of these houses, a good number of which are today leased out for quite a tidy sum by the Singapore government. One that I recently got to see – thanks to arrangements made by a friend and fellow blogger James Tann and with the kind permission of the house’s occupant, was at 159 Mount Pleasant Road. Laid out in a style typical of the early “Black and White” house – of single room depth and with a carriage porch arranged under a projecting second storey verandah, the house at #159 is one of a cluster of similar houses built in the 1920s along the north facing slope of Mount Pleasant to serve as residences for the fast developing municipality’s Municipal Councillors.

The carriage porch and projecting second storey verandah.

The carriage porch and projecting second storey verandah.

The projecting second storey verandah.

The projecting second storey verandah.

Located close to the top of Mount Pleasant, one of the high points in the series of undulations that extend to the burial grounds to its northwest at the area of Bukit Brown, there is much to admire about the house and its expansive grounds. I was to learn from James that what was most interesting about the house was however neither its architecture nor the beauty of its setting but a secret it held for some seventy years.

From the porch one steps into an entrance hall and the stairway - again typical of an daly 'Black and White' house design.

From the porch one steps into an entrance hall and the stairway – again typical of an early ‘Black and White’ house design.

The dining room on the ground level, as seen from the entrance hallway.

The dining room on the ground level, as seen from the entrance hallway.

James, who was photographing the house for a book on the Adam Park Project, shared what had been learnt about #159 and about some of the houses in the vicinity from piecing together evidence found in history books, maps and also what had quite recently been uncovered on the grounds. The project, which is led by battlefield archeologist Jon Cooper, seeks to establish what did go on in and around Adam Park in the dark days of the first half of February 1942 from archaeological evidence.

The area in the foreground was where both spent ammunition and a cache of unused British ammunition was recently uncovered.

The area in the foreground was where both spent ammunition and a cache of unused British ammunition was recently uncovered.

Jon Cooper paints a picture of the events of the last days leading up to what does seem to have taken place on the morning of 15th February 1942, the day of the surrender, in a video that relates to a dig carried out at #159 early this year. Meeting with stiff resistance from the Cambridgeshire regiment who held the ground for three days at Adam Park, the Japanese forces move slightly to the north. On the evening of 14th of February, the Japanese break through positions held by 4th Battalion of the Royal Suffolks at the Singapore Island Country Club and at Bukit Brown. The Suffolks retreat, falling back across a valley (which would be the low ground at Jalan Mashhor / Gymkhana Avenue), to positions on Mount Pleasant. Here, a mixed of units including the 125th Anti Tank Regiment, the Royal Engineers and elements of the 9th Northumberland Fusiliers, have the area fortified for a Japanese attack, with the “Black and White” houses there serving as defensive positions.

Cooper tells us also of two well documented attacks on Mount Pleasant that follow. One comes from an account recorded by Henry Frei, who once taught at the NUS, based on interviews with Japanese veterans. This account makes mention of an attack on “Hospital Hill” which wipes out a whole company of Japanese troops.

The house that was thought to be used as a hospital on the top of Mount Pleasant.

The house that was thought to be used as a hospital on the top of Mount Pleasant.

Another account Cooper refers to speaks of attempts on the morning of 15th February to retake a house that had been infiltrated by the Japanese. The house, on the north side of Mount Pleasant Road, is described as as hard to take due to its elevation below the road. Following two failed attempts to retake it, the house is hit with 12 anti-tank shells fired from a gun positioned at the junction of Mount Pleasant Road and Thomson Road. The house catches fire, is cleared of Japanese troops, and eventually burns down. Evidence provided by 1948 aerial photographs point to the house being one with a new roof at #160. This lies right across Mount Pleasant Road from #159 and seems also to be confirmed by a Singapore Free Press article of 25 June 1948 reporting the discovery of the remains of 8 soldiers on the grounds of a “bombed house” at 160 Mount Pleasant Road.

160 Mount Pleasant Road, which was infiltrated by Japanese troops and subsequently bombed.

160 Mount Pleasant Road, which was infiltrated by Japanese troops and subsequently bombed.

The far end of #159’s garden, was also where one set of remains was located, that of a British officer. Although the remains were subsequently moved to Kranji, one of the aims of the dig at #159 was to find evidence of the that may have possibly been left behind.

A view towards the far end of the garden. The remains of a British officer killed in the course of fighting, was buried.

A view towards the far end of the garden. The remains of a British officer killed in the course of fighting, was buried.

While no evidence of that was found, the main focus of the dig, which took place at the near end of the huge garden, did meet with success. With some of what had lay buried in this area having been exposed following the removal of a tree and the gradual washing away of the topsoil by rainwater, the dig there managed to uncover thousands of pieces of ammunition. The find, which includes both spent cases and a cache of unused ones that had deliberately been buried, confirms that there had been fighting in the garden of #159, which would have been used as a staging point for the attack on #160. The large quantity of unused ammunition of British origin, provided evidence of the final positions of British troops as they made their preparations prior to surrender.

Mount Pleasant Road served as the final battle line before the capitulation.

Mount Pleasant Road, seen here running between #159 and #160, served as a final battle line before the capitulation.

There is probably a lot more that currently lies buried on the grounds of #159 and the other “Black and White” houses in the vicinity. It may be that the grounds of these houses may never reveal their secrets. Based on what’s seen in the Urban Redevelopment Authority’s 2014 Master Plan, it does seem that the area will be the subject of future redevelopment, perhaps as part of the intended Bukit Brown estate on the evidence of the two MRT stations in the vicinity. It would be a shame if and when this happens as not only will we lose a green part of Singapore with its “Black and White” reminders of a forgotten age, we will lose a link to a chapter in our history that must never be forgotten.

The URA Master Plan 2014 indicates that the area will be redeveloped in the future.

The URA Master Plan 2014 indicates that the area will be redeveloped in the future.


More photographs of 159 Mount Pleasant Road

JeromeLim-5606

JeromeLim-5610

JeromeLim-5623

JeromeLim-5630

JeromeLim-5632

JeromeLim-5633

JeromeLim-5635

JeromeLim-5637

JeromeLim-5638

JeromeLim-5640

JeromeLim-5648

JeromeLim-5650

JeromeLim-5655

JeromeLim-5666

JeromeLim-5657

JeromeLim-5677

JeromeLim-5679

JeromeLim-5685

JeromeLim-5692

JeromeLim-5693

JeromeLim-5702

JeromeLim-5707

JeromeLim-5720

JeromeLim-5719

JeromeLim-5713

JeromeLim-5598

JeromeLim-5699