The changing landscape at the ninth mile

15 06 2013

One part of Singapore where the landscape has seemed to be in a state of constant flux – at least in more recent times, is the area from the 9th to the 10th milestone of Bukit Timah. The area is one that has long been associated with the old railway, being one of two locations in the Bukit Timah area where an overhead railway truss bridge can be found, and where the train used to run quite visibly along large stretches of the length of the road.

Seeing the tailend of the trains the area is very much associated with - train operations ceased on 30 June 2011.

Seeing the tailend of the trains the area is very much associated with – train operations ceased on 30 June 2011.

A passing train in the 9 1/2 mile area - the stretch was one where the trains running close to the road were quite visible.

A passing train in the 9 1/2 mile area being captured by a crowd in June 2011 – the stretch was one where the trains running close to the road were quite visible.

The truss bridge at the 9th milestone.

The truss bridge at the 9th milestone.

The ninth milestone area is now in a state of change.

The ninth milestone area is now in a state of change.

Another view northwards.

Another view northwards – road widening work is very noticeable.

A train running across the bridge seen just before the closure of the railway in 2011.

A train running across the bridge seen just before the closure of the railway in 2011.

Now abandoned by the railway – the railway ceased operations through Singapore with its terminal moving to Woodlands Train Checkpoint on 1 July 2011, the bridge does remain as what is perhaps one of two reminders of the railway, the other being the two rows of single storey houses facing Upper Bukit Timah Road straddling Jalan Asas which we now know as The Rail Mall, which in being named after the railway, does help to preserve its memory.

The row of single storey houses straddling Jalan Asas in 1989. The houses have since been converted into The Rail Mall.

The row of single storey houses straddling Jalan Asas in 1989. The houses have since been converted into The Rail Mall (photograph used with the kind permission of Henry Cordeiro).

Another photograph of what today has become The Rail Mall.

Another photograph of what today has become The Rail Mall (photograph used with the kind permission of Henry Cordeiro).

All around the area, the construction of  Phase II of the Downtown Line (DTL) of the Mass Raid Transit System (MRT) which started before the railway abandoned it, is very much in evidence. The work being done has left little in its wake untouched, with a wedge being driven between the two carriageways which make up Upper Bukit Timah Road at its junction is with Hillview Road, just north of The Rail Mall, and disfiguring much of the area as we once know it.

9 1/4 milestone Bukit Timah now dominated by new kids on the block as well as cranes and construction equipment.

9 1/4 milestone Bukit Timah now dominated by new kids on the block as well as cranes and construction equipment.

Local model and TV host Denise Keller with sister Nadine seen during a Green Corridor organised walk in the area on the final weekend before the train operations ceased in June 2011.

Local model and TV host Denise Keller with sister Nadine seen during a Green Corridor organised walk in the area on the final weekend before the train operations ceased in June 2011 – even since then, there has been quite a fair bit of change that has come to the area.

Looking down Hillview Road from the junction, we now see that two landmarks in the area which have survived until fairly recently, have also fallen victim to the developments which will also see roads being widened – a major widening exercise is currently taking place along Upper Bukit Timah Road. A railway girder bridge which looked as if it was a gateway to an area it hid which had housing estate and factories which came up around the 1950s and 1960s, has already been dismantled. That went soon after the railway did. Its removal does pave the way for the road to eventually be widened, thus permitting the private residential developments intended for the vacant plot of land that was occupied by the former Princess Elizabeth Estate. The land for the estate, based on newspaper reports from the 1950s, was a donation by Credit Foncier intended for public housing made to the Singapore Improvement Trust in 1950 and has somewhat sacrilegiously been sold off to the highest bidder.

A train crossing the now missing girder bridge at Hillvew Road in early 2011.

A train crossing the now missing girder bridge at Hillvew Road in early 2011.

Along with the bridge, a building that has long been associated with the corner of Upper Bukit Timah and Hillview Roads is another structure we would soon have to bid farewell to. Completed in 1957 as a branch of the Chartered Bank (which later became Standard Chartered Bank), the building has also long been one of the constants in the area. When the branch vacated the premises early this month, it would have have seen some fifty-six years and two months of operation at the building, having opened on 6 April 1957.

The recently closed Chartered Bank branch building with a notice of its closure.

The recently closed Chartered Bank branch building with a notice of its closure.

Rendered insignificant by hoardings, towering cranes and construction equipment – as well as more recent buildings in the vicinity that now dominate the landscape, the bank building occupying the corner of Hillview Road on a little elevation was one that, in greener and quieter days, was not missed. It provided great help to me as a landmark on the bus journeys I took to visit a friend’s house up at Chestnut Drive, two bus stops north, back in the 1980s.

The Chartered Bank, a popularly referred to landmark in the area, as it looks today.

The bank as it looked in 2010.

It would probably take a few more years for the dust in the area to settle. And judging by the way developments seem to be taking most of what did once seem familiar, by the time the dust does settle,  there may be little for us to make that connection with the world  the area did host in days that already seem forgotten.

A last look at a landmark soon to vanish.

A last look at a landmark soon to vanish.

277A2957

277A2945

Advertisement




The mourning after the morning after

1 08 2011

A month after the cessation of the old Malayan Railway’s services through Singapore and into Tanjong Pagar, we are seeing, besides the removal of the tracks, a complete alteration in the physical landscape of one of the prettier parts of what the Nature Society hopes would be a Green Corridor through Singapore, and possibly erasing features of the landscape that one would associate with a former rail corridor.

The view down the corridor in the Bukit Timah Station area on 1st July 2011.

The view from Bukit Timah Station.

Another look at the work in the vicinity of the station. Earth is being filled over the corridor erasing any traces of the former rail corridor.

There is no doubt that the area is one of the favourites amongst the many Singaporeans who now have walked the length of the rail corridor, being one that in its relative isolation was blessed with lush greenery and a wonderful array of bird and insect life. It was here that one can get up close to the munias that frolic on the railway tracks, the noisy parakeets that flutter on the branches of the trees above and even oriental pied hornbills flying overhead. It was also here where one could dance with the wondrous colours of the delightful dragonflies and butterflies and get a breath of wonderfully fresh air as dawn turns into day.

The area was where one could once dance with dragonflies.

There was a wealth of flora and fauna in the area - a pair of Scaly Breasted Munias seen on the railway tracks in June 2011.

The area is also probably one of the less accessible areas of the tracks and there was already some concerns raised prior to the work commencing to remove the tracks in the area about an access road that was being built into the area through the lush Clementi woodland that separates the area from Clementi Road to which the authorities have explained was necessary to facilitate the removal works which was being carried out within an extremely tight schedule and the authorities pledging that SLA and the contractors involved would work with NParks to plan access routes and minimise the damage to the existing flora and fauna. That however does not seem to be what is happening on the ground, and even with photos I have seen and feedback I have received from friends, I was unprepared for what I saw in my first visit to the area since it was closed up to the public on the 18th of July. What greeted me was a scene beyond what I imagined could have happened in a mere two weeks. Beyond the removal of the tracks, sleepers and other structures along that stretch of the corridor, it looks as if the whole area has been transformed into a dusty work yard where there had been some of the most wonderful greenery. The entire width of the corridor seems as if it is not just an access road to the area that is being built, but an entire highway through from Holland Road to Bukit Timah Station, with even soil being brought in to raise the level of what had been the rail corridor erasing any traces that it might have once been a rail corridor. While the vegetation and the animals that make the area such a wonderful place to run off to, may find its way back to the area once work is completed, what is certainly of concern is that all the work that is being done has also altered the landscape of one of the prettiest parts of the rail corridor and with that, a lot of how it had been and any evidence of the railway it may have had is now a thing of the past.

Another view of the clearing and earth filling works.

A wide area has been cleared and now looks like a huge work yard.

The undisturbed view towards Bukit Timah Station on 17 July 2011.

Captioned on a previous post 'The sun sets over the rail corridor': 'A scene that would soon only be a memory - the rail corridor on the 17th of July 2011 just as I want to remember it'. How true it now all seems.

The view towards Bukit Timah Station on 31 July 2011.

Another view towards Bukit Timah Station on 31 July 2011.

Earth is being brought in and the level of the former corridor is being raised.

The new soil that is placed to raise the level of the corridor burying any traces of the original corridor beneath it.

It looks almost as if a road is being built over the former rail corridor.

An excavator sits on new earth being brought in to bury the rail corridor.

Vegetation that has been trampled on by the vehicles in the area.

The human invasion wouldn't be complete without litter left behind to clog streams in the area.


Posts on the Railway through Singapore and on the Green Corridor:

I have also put together a collection of experiences and memories of the railway in Singapore and of my journeys through the grand old station which can be found through this page: “Journeys through Tanjong Pagar“.

Do also take a look at the proposal by the Nature Society (Singapore) to retain the green areas that have been preserved by the existence of the railway through Singapore and maintain it as a Green Corridor, at the Green Corridor’s website and show your support by liking the Green Corridor’s Facebook page. My own series of posts on the Green Corridor are at: “Support the Green Corridor“.






The morning after

2 07 2011

I took a walk the morning after the party along the corridor that welcomed the last train to pull into Tanjong Pagar which became the last ever Malayan Railway train that the same crowd waved into the darkness of the night. It was a walk to take in a wonderfully fresh and green world that close to eight decades of the railway corridor as we know today had given to us. It is a world that I had become first acquainted with from my numerous journeys on the trains that we now see no more, a world apart from the modern world we have since become comfortable finding a fit into. It is a world that I for one often chose to escape to. The station at Bukit Timah and the area around it being a stretch of the corridor, that in its relative obscurity, has often provided me with a welcome respite from the hectic world that lay just 200 metres away down a narrow path from the station. What is to become of this wonderful world now that we have sent the last of the trains through it off, we don’t now know, but there are certainly many who wish to see that the charm of the green world that lines the corridor kept as it now is, providing a world that many in Singapore can as I have done run off to …

The former rail corridor provides an escape from the urban world we live in.

The greenery is a refreshing change to the grey world we live in.

The walk down the stretch that I covered started at the bridge at Holland Road through an area that is possibly one of the more scenic stretches of the corridor, leading to that quiet little building that has in the last month come alive with many hoping to bid farewell to the railway and the wonderful people who ran the railway through Singapore. As I walk through the clearing mist, I felt a surreal sense of peace, one that the air of silence of a corridor that has descended after eight decades of silence punctured by the occasional sound of steam engines, horns and whistles and more recently, the drone of the diesel engines and the air operated horns and whistles that most will now remember. The air of calmness was all encompassing and that with the cool of the morning air made the walk down that stretch especially invigorating.

The lifting mist enhanced the surreal feel to the now surreally silent corridor.

It wasn’t long before I reached the tiny building that served as Bukit Timah Railway Station … and again, the silence that greeted me was somewhat surreal, in stark contrast to the amazing and frenzied scenes of the night’s send off just eight hours before my arrival at the now silent building. The flags that fluttered from the flagpoles that stood between the station’s building and the platform were missing, the station’s door was firmly shut, as the station stood forlornly alone in a world that no longer has a use for it as a station. At the north end of the station, the sight of a burly security guard against the backdrop of the now silent station and tracks and the green Singapore Land Authority sign confirmed the station’s demise … no longer would we see that men in blue working tirelessly passing and receiving the looped piece of wirerope with a pouch at the end. With the passing of the last train in … the last of the old fashion practice of handing authority to the trains on the single stretch of track by means of the key token had also passed into history on the Malayan Railway line …

Bukit Timah Station now sits in silence and wears the forlorn look of an unwanted structure, in contrast to scenes just 8 hours before when a frenzied crowd had gathered in the dark of night to send the last train off. The building is now a conserved building.

The signs are now up … just hours after the handover and a security detail is in place.

The flags have stopped fluttering in the wind and the doors are now closed.

The security detail is provided to guard against any attempts to remove items (some of which are KTM property) from and to prevent vandalism at the station.

The passing of the trains provides what was I guess a first opportunity to walk on the bridges – something that many have risked their lives doing when the line was still active despite the warnings that have been given. Now, it is safe … as is the narrow northern stretch of the corridor lay beyond the truss bridge near Bukit Timah station. I did just that, walking the narrow 3 kilometre length towards the next truss bridge close to where the Rail Mall is. My most recent encounter with it was of course through the opened door of the train through which the rushing of greenery, the yellow of the kilometre markers and the wind blowing in my face provided me with a different perspective to the one I could now take in at leisure. The stretch is one on which work to remove the tracks would come later, with some parts of the track laid with monitoring equipment for the Downtown MRT line which is being constructed almost parallel to the old railway line. It is the sense of peace and quiet that surround me that I enjoyed, together with the wonderful green that made the walk all worthwhile … and while I do feel a deep sense of loss of a railway that I so love, I do hope to see that at least the memory of it is kept by preserving this ready made escape from the hectic world we spend too much of our time in. In news that came through on the afternoon after my walk, the URA and SLA have, in an encouraging move responded to requests by the public to allow the tracks and corridors to be explored by opening up the railway corridor for the public for 2 weeks. In the same new release, the URA and SLA are also seeking public feedback on the use of the railway land. More information can be found in the URA’s news release below.

A last look before the station is fenced off ….

The cessation of train services to Tanjong Pagar allows access for the public to the previously dangerous bridges.

A window into the wonderfully green and peaceful world beyond the road bridges at Rifle Range Road.

The fence of the former Yeo Hiap Seng factory still lines the railway corridor by Rifle Range Road.

The stretch from Rifle Range Road to Hindhede.

A colourful resident of the Green Corridor.

On top of the girder bridge over Hindhede Road – one of the bridges that would be retained.

The approach to the end point of my morning after walk …. the truss bridge near the Rail Mall.


Posts on the Railway through Singapore and on the Green Corridor:

I have also put together a collection of experiences and memories of the railway in Singapore and of my journeys through the grand old station which can be found through this page: “Journeys through Tanjong Pagar“.

Do also take a look at the proposal by the Nature Society (Singapore) to retain the green areas that have been preserved by the existence of the railway through Singapore and maintain it as a Green Corridor, at the Green Corridor’s website and show your support by liking the Green Corridor’s Facebook page. My own series of posts on the Green Corridor are at: “Support the Green Corridor“.


URA/SLA’s Press Release

1 July 2011

Public works and future plans for former railway land

The lands previously occupied by Keretapi Tanah Melayu (KTM) for railway use have been vested in the Singapore Government with effect from 1 July 2011.

As agreed with Malaysia, Singapore will remove the tracks and ancillary structures of the KTM railway and hand them over to Malaysia. The Singapore Land Authority (SLA) will commence these removal works as well as conduct maintenance works around the various railway sites shortly.

Public Can Access the Railway Tracks

Nevertheless, in response to requests for an opportunity for the public to trek along and experience the tracks, the SLA will be staging its works. From 1 Jul 2011 to 17 Jul 2011, the entire line of railway tracks will be open to public for 2 weeks, except for some localised areas.

After 17 Jul 2011, a 3km stretch of railway tracks from Rifle Range Road to the Rail Mall will continue to be open to the public till 31 Jul 2011.

As the railway tracks can be narrow and rough at certain locations, members of the public are advised to exercise caution when walking along the track.

The Tanjong Pagar Railway Station and Bukit Timah Railway Station will be closed temporarily to facilitate the moving out of the furniture and equipment by the KTM and its tenants. The SLA will also carry out maintenance works and structural inspection. More information on their re-opening will be provided to the public in due course.

Removal Works along the Railway Tracks

From 1 Jul to 17 Jul 2011, minor works will be carried out at the Bukit Timah Railway Station and the railway crossings at Kranji Road, Sungei Kadut Avenue, Choa Chu Kang Road, Stagmont Ring and Gombak Drive. Members of the public should avoid these work areas which will be cordoned off.

Works to remove the railway tracks along the rest of the former railway line, except for the 3km stretch from Rifle Range Road to the Rail Mall, will commence from 18 July 2011. The removal works include the clearance of minor buildings, sleepers, tracks, cables, gates, posts and debris around the various sites from Tanjong Pagar to Woodlands. Other items to be removed include railway equipment, such as signal lights, level crossings, controllers and traffic lights. The removal works are to be fully completed by 31 December 2011.

Due to these extensive removal works, the affected areas will be secured and cordoned off. For safety reasons, members of the public are advised to keep away from these areas whilst the removal works are ongoing.

Public Feedback Sought

The Urban Redevelopment Authority (URA) will comprehensively review and chart the development plans for the former railway lands and their surrounding areas. As part of its review, the URA will study the possibility of marrying development and greenery, such as applying innovative strategies to maintain a continuous green link along the rail corridor without affecting the development potential of the lands.

The URA welcomes feedback and ideas from the community in shaping the future development plans for the railway lands. The members of the public are invited to visit and provide their ideas at www.ura.gov.sg/railcorridor/.

Issued by:
Singapore Land Authority & Urban Redevelopment Authority






A send off at the weekend for our old friends …

27 06 2011

Singapore residents were out in force to wave goodbye to the Malayan Railway that has been very much a part of the island’s landscape for over a century during the final weekend of its operations. It wasn’t just at Tanjong Pagar Railway Station which possibly because of the last day of operations of its food stalls today, has seen a large increase in visitors over the last week, but many other places along the line. At the We Support the Green Corridor’s walk in the morning, the largest crowd seen in the series of walks conducted over several months to raise awareness of the proposal by the Nature Society (Singapore) or NSS to retain the soon to be vacated railway corridor as a continuous green corridor through Singapore, of more than 120 that included local model and TV host Denise Keller gathered at the Rail Mall at 8 am to take a 3 km walk north not only to acquaint themselves with glimpses of the green corridor, but also to an area that was of historical significance to the first days of Tanjong Pagar Railway Station, being the area where the first train that pulled in to Tanjong Pagar, had departed with its load of passengers that included Sir Cecil Clementi, the then Governor of Singapore, who opened Tanjong Pagar Railway Station on the 2nd of May 1932.

Among the more than 120 participants in the We Support the Green Corridor Walk was local TV personality and model Denise Keller.

The starting point of the We Support the Green Corridor walk was in the shadow of one of one of two truss bridges that give the Bukit Timah area its character, which was referred to in a comment left on the Facebook Page of the We Support the Green Corridor by the Minister of State for National Development Tan Chuan Jin, which seemed to indicate it, along with the bridge at Bukit Timah Road near Bukit Timah Station and the bridge at Hindhede (at the entrance to Bulit Timah Hill Nature Reserve) would be retained. The news of this was certainly greeted by many with relief and even expressions of joy. The ending point of the walk was at the Bukit Panjang level crossing, what is the widest level crossing in Singapore close to where that first train to Tanjong Pagar had departed from at a station that no longer exists, Bukit Panjang. Through much of the walk, signs of the massive construction efforts to get what is ironically a new railway in the form of the Downtown MRT Line that takes a course for much of its way along what was the original Singapore to Kranji Line that was deviated to turn the line towards Tanjong Pagar. It is also ironic that the new railway would in all probability hasten the greying of a corridor that the old railway has for so many years kept green for us.

Participants on a We Support the Green Corridor walk caught a glimpse of a southbound train on the black truss bridge over Upper Bukit Timah Road. Many on the walk expressed relief when they learnt that this bridge was not part of the structures that would be removed in tender awarded to Indeco to dismantle the tracks and ancilliary structures scheduled to be carried out from July to November 2011.

Through much of the accessible parts of the green corridor and at Bukit Timah Station, there were indeed many who were seen to greet the passing trains, a last chance for many to see the passing of trains through Singapore and to bid farewell to a railway that will leave many who have taken a ride on it through the archways of the magnificent station at Tanjong Pagar with a sense of sadness and loss and to a group of people who through their dedication has provided Singapore with a wonderful association with the railway going back to 1903 when the Singapore to Kranji Line was completed. The outpouring of feeling is perhaps driven by the sense of loss not just for a railway that has served us for so long, but also for a landscape that could change drastically once the railway stops operating through Singapore. It is this landscape that many hope will be preserved, there is of course a balance between development and conservation that has to be found in all this, and while the railway land does free up development opportunities in many parts of Singapore, the benefits of maintaining a continuous green corridor as a shared recreational space which can also be used as an uninterrupted path from the north to the south of the island with which the use of bicycles as a means of transport becomes viable, cannot be understated. It is therefore encouraging that the Mr Tan Chuan Jin has in his comments stated that the authorities “remain committed to working closely with NSS and others who love this stretch of land so that we can develop this sensibly together”.

Many gathered at many places along the line to wave at the drivers of passing trains.

Many others were seen walking down the tracks for one last time ...

With that, there certainly is hope for a solution that would, as we wave our goodbyes and extend our gratitude to a railway and the men of the railway that we will soon lose, perhaps see some of the wonderful places and spaces that the railway has left behind be retained as it is for not just us but also for our future generations – that may at least preserve that fond memory of an old railway line that once ran right through the heart of Singapore.

The crowd at Bukit Timah Station.

... a passage to the north which on the 30th of June will no longer be used ...


Posts on the Railway through Singapore and on the Green Corridor:

Information related to the station and its architecture can be found on a previous post: “A final look at Tanjong Pagar Station“. In addition to that, I have also put together a collection of experiences and memories of the railway in Singapore and of my journeys through the grand old station which can be found through this page: “Journeys through Tanjong Pagar“.

Do also take a look at the proposal by the Nature Society (Singapore) to retain the green areas that have been preserved by the existence of the railway through Singapore and maintain it as a Green Corridor, at the Green Corridor’s website and show your support by liking the Green Corridor’s Facebook page. My own series of posts on the Green Corridor are at: “Support the Green Corridor“.


Comments made by Minister of State for National Development Mr Tan Chuan Jin on the We Support the Green Corridor’s Facebook Page:

These 3 bridges are part of the agreement that will go back to Malaysia (Sg Mandai, Junction 10 and over Hill View Road). It has been a long negotiation process over many many things. We have retained what we can, including stretches of railway in areas near the stations. I am sure you know that these 3 are not the same as the iconic steel girder (believe he meant “truss”) bridges across Upper Bt Timah and Bt Timah Rds. The one at Hinhede will also remain. The other one close to Sunset Way that spans across Ulu Pandan Canal already belongs to us and will remain so.

We remain committed to working closely with NSS and others who love this stretch of land so that we can develop this sensibly together.

Our friends at URA and NParks care for the environment and heritage as much as many of you do but they also have to grapple with the dilemmas of ensuring living space for the many young Singaporeans who will be coming of age in the years ahead. As I have pointed out in my note, we are actively greening and blueing where we can and to work with the environment as much as possible.






A walk on the wild side of the north

17 06 2011

In the company of a few friends, I took a walk down a part of northern Singapore that what will soon be a memory. It is a stretch of land that i had made an acquaintance of only through my many railway journeys that had started at Tanjong Pagar, during which the stretch has always seemed like a green oasis in the grey urban landscape of Singapore. It is I guess the knowledge that this, and many other stretches which are there only because of the Malayan Railway’s existence, will soon be lost to us – a tender awarded by the authorities in Singapore will see the removal of much of the beloved railway: the tracks, the signal posts, the level crossings, and the girder bridges (there is no mention of the two iconic truss bridges in the tender). With work scheduled to commence on the 1st of July and expected to end in November, chances are, these last few weeks of the railway in Singapore will be our last chance of seeing the wonderful green corridor that the railway has given us.

Evidence of the railway including these pulleys for the signal post will soon be removed. In tender has been awarded by the authorities, work to remove all these is scheduled to commence in July and end in November.

Evidence of the railway, not just along the stretch from Kranji to Sungei Kadut, but all through the railway corridor would soon be gone.

The 30th of June will see the last train cross a road in Singapore ... a sign along the railway line indicating the approach to a level crossing.

The stretch from Kranji to Sungei Kadut that we walked along, would have once been along a swampy area – part of a large mangrove swamp that stretched from the northern shoreline to the Sungei Kadut industrial area which was reclaimed in the 1960s. Although there is some evidence of the mangrove swamp still around, mcuh of the area around the tracks has become a wonderfully green corridor in which the urban landscape seems like its light-years away.

The starting point of the most recent walk was the Kranji Level Crossing close to Woodlands Train Checkpoint.

A view of the tracks through the signal hut.

Label plates on the crossing's control levers.

The new railway passing over a stretch of the old railway at Kranji.

A damsel in distress? A damselfly seen along the northern green corridor.

Wild flowers growing by the wild side of the tracks.

Orange bracket fungus growing by the side of the tracks.

It is sad to think that all this might soon be gone, and while the signs are encouraging with the news that the Minister of State for National has come out and stated the Ministry’s interest in the proposals, chances are that many areas through which the railway runs through is really too valuable from a developmental point of view not to be sold to the highest bidder – which I hope is not to be the case. There are but two weeks left for us to see the wonderful green corridor as it is and probably as it has been for some 79 years when the railway deviation of 1932 gave us the line as we know today. And, just a note of caution if you are to explore the railway corridor on your own – the land is essentially private property, and walking on or along the track is extremely dangerous (as well as carrying the risk of a fine). Trains can be deceptively quiet and walking on the track or along it is not recommended especially for children – a distance of some 3 metres should always be maintained (moving trains have the effect of creating a low or suction pressure as the pass at speed) and always pair up and do make it a point to look out for each other. Do also remember that proper (and covered) footwear is necessary.

A directional sign to the zoo seen through a clearing.

The approach to Sungei Kadut.

A view of the luscious greenery near Sungei Kadut.

The approach to the level crossing at Sungei Kadut.

Skull and crossbones not of the Jolly Roger, but a dog that was run over by the train.

The end point - the crossing at Sungei Kadut Avenue.


Information that may be of interest:

Information related to the station and its architecture can be found on a previous post: “A final look at Tanjong Pagar Station“. In addition to that, I have also put together a collection of experiences and memories of the railway in Singapore and of my journeys through the grand old station which can be found through this page: “Journeys through Tanjong Pagar“.

Do also take a look at the proposal by the Nature Society (Singapore) to retain the green areas that have been preserved by the existence of the railway through Singapore and maintain it as a Green Corridor, at the Green Corridor’s website and show your support by liking the Green Corridor’s Facebook page. My own series of posts on the Green Corridor are at: “Support the Green Corridor“.


This slideshow requires JavaScript.





A walk on the wild side

15 05 2011

I took a walk into a world where there might not have been one, where gold, crimson and blue tinged fairies dance a flight of joy, a joy that’s echoed in the singing of songs of joy that eludes ears made weary by the cacophony of the grey world we have found ourselves in. It is a world that seeks to be found in the midst of the cold grey world we find around us, a world that we may soon lose with the lost of the reasons for its being. The world I speak of is none other than the Green Corridor that has existed solely because of the railway which has allowed a green and seemingly distant world to exist next to the concrete world that we have created in our island.

A world that seeks to be discovered - but how much longer will it be there for us?

The walk on the wild side passed through some two kilometres of plush greenery which now probably exists only because of the railway that runs through the area.

The walk that I took was with a group of some 30 people, led by the Nature Society of Singapore and the National Library Board (NLB) to a stretch that I had previously only seen from the perspective of a passenger on the train. It was a short but interesting walk that started at the foot of a railway bridge across Dunearn and Bukit Timah that takes me back to my childhood days – the black truss bridge that I have since my early days looking out for it from the back seat of my father’s Austin 1100, associated with the area. Led by our expert guide, Ms Margie Hall, we were taken not just on a history trip through the slightly more than two kilometre route to the road bridge over the railway at Old Holland Road (close to its junction with Ulu Pandan/Holland Roads), but on a nature trail, as names of birds some of which as Singaporeans we have forgotten about, rattled off Ms Hall’s tongue.

The railway bridge, our starting point, was one that I have identified with the area since my early days spent looking out for it from the back seat of my father's Austin 1100.

One of the features of the walk from a historical perspective was of course the station at Bukit Timah, built to serve the great railway deviation of 1932 which turned the line in that direction and onto Tanjong Pagar. These days, the station serves more as a point where the exchange of the key token, made necessary by the single track is made, a practice I have observed many times from my many encounters with the train.

Bukit Timah Station now serves as a point for the exchange of the key token. In the days gone by, the station was where racehorses coming in to race at the Turf Club were offloaded as well.

A waiting train at Bukit Timah Station.

It was beyond the station that my journey of discovery started. Looking into the distance the width of the clearing through which the line ran looked very much wider than most of the other areas I was familiar with. This was understandable from the perspective of the station itself where alternate tracks for waiting trains to shunt onto were necessary. The width was of course explained by the fact that a line had branched off at the station – the old Jurong Line which was constructed in a project initiated by the Economic Development Board (EDB) to supplement the development of Jurong Industrial Estate. The line ran in parallel for a short distance before turning west into a tunnel under Clementi Road – what is now an area with dense vegetation that is featured in Liao Jiekai’s award winning movie Red Dragonflies which is currently on a limited run at Filmgarde Iluma. The stretch is already popular with cyclists and joggers who in using the stretch of the Green Corridor, shows that there is already a lush stretch of greenery that is ready made – with the authorities having to spend very little money to develop compared to the millions spent on the park connector network. Ms Hall also shared her visions for the area, saying that the tracks should be kept along with the station in its original condition – the station, which has also been listed as one with conservation status (meaning that only its façade needs to be conserved). Ms Hall felt that conserving the station without keeping it in the original condition would not serve the purpose of conserving it – something that I certainly agree with. Some of the thoughts she had included running a replica railway over a short length of tracks to and from the station to allow future generations to have an appreciation for the trains which had served us for over a century.

The stretch of the Green Corridor is already popular with joggers ...

... and cyclists ... proving that is already a long "park connector" that is ready for use.

The clearing through which the portion of the corridor south of Bukit Timah Station runs is wider than most other parts of the rail corridor.

Ms. Hall felt that the tracks should be kept in place for our future generations to appreciate.

The area where the Jurong Line would have turned off into the tunnel is marked by piles of wooden railway sleepers and is one where we stopped and were able to take in the diversity of birds and insects in their songs and dances of joy in and around the lush greenery before us. It was at this point where Ms Hall was in her element, being able to identify birds from the sounds that rose above the others in the background, identifying that of an Iora and a Tailorbird upon hearing their calls. Ms Hall also pointed out Long-Tailed Parakeets high in the trees as well as a pair of Scaly-Breasted Munias foraging in the grass. From this point the corridor is marked with a narrow path through which we passed through single file. The sight of the bridge over Old Holland Road which marked the end of the trail brought with it what was perhaps an ominous gathering of dark clouds … dark clouds that seem to hover over the future of a wonderful gift of nature that Singaporeans seemed to have passed over.

It wasn't just red dragonflies that were able to discover ...

... but also saffron coloured ones ...

... and turquoise coloured ones as well.

A parakeet perched high at the top of a tree - one of the many birds we encountered.

Morning Glory.

A cassava or tapioca leaf.

Proceeding single file on towards Old Holland Road.

For the Green Corridor, the first of July this year sees not only sees the end of its use by the railway, but its continued existence would be under threat. The indications are that there are already plans to redevelop some of the areas which would be reclaimed by Singapore. During the budget debate in Parliament in March this year, the then Foreign Minister George Yeo was quoted as saying that “the development of areas along the railway line, including Silat Estate and the expansion of the One-North business park in Buona Vista, will start after July 1” (see the Straits Times report dated 4 March 2011). It has also come to my attention that a tender was called for the “removal and storage of railway including ancillary structures from Woodlands Train Checkpoint to Tanjong Pagar Railway Station” which closed recently with work scheduled to commence on 1 July 2011. It does look that proposals to retain the green corridor made by the NSS has largely been overlooked by the authorities involved, and the authorities are pressing ahead with the redevelopment of a rich natural resource and a part of our green heritage. It is a shame if this does happen, as not only will we see the last of the passing locomotives and carriages that weaved their way slowly across the island for over a century, but also the last bits of a part of Singapore that the railway has given to Singapore. It only through my recent wanderings that I have become so well acquainted with some portions of it and have began to have a appreciation for what the corridor is worth to us. There are some wonderful ideas that advocates of the Green Corridor have for preserving the corridor – some were in fact presented and discussed right after the walk which was part of a programme that included a forum. This I would touch on in another post. What I hope for is that whoever is involved in the plans for the redevelopment of the area pauses to consider some of these proposals more seriously and to also consider we and more importantly our future generations, would be losing should the Green Corridor be taken over by the concrete jungle that so much of Singapore has now become.

Arched brickwork of a culvert supporting the railway tracks near Old Holland Road.

The little things that matter - the rich biodiversity that the railway corridor supports would be lost to the concrete jungle should plans to redevelop the corridor be executed.

From one bridge to the next ... the bridge at Old Holland Road under which the railway corridor passes through.





The human train to the Sunset

24 01 2011

It was on a fine Saturday morning, that I decided to take a four and a half kilometre walk that was organised by the Nature Society of Singapore, along a part of the industrial history of a Singapore that was still finding its feet in the uncertain climate that had surrounded Singapore in the 1960s. It was at a point in time when Singapore was contemplating joining what was then referred to as the Federation, the Federation of Malayan States, better known as Malaya, that work on the Jurong Industrial Estate, a massive project that played a significant part of the island nation’s rapid industrialisation in its early years. There is no doubt that the transformation of a marshy and hilly ground which would have been unsuitable for development had the effort that flattened the hills and fill up the swamps over a 3.5 hectare area to not just build an industrial complex, but provide housing and amenities in the area to the workforce that cost hundreds of millions – the biggest single project that had been taken on by the forward looking self-government and the brainchild of the then Finance Minister, the late Dr. Goh Keng Swee, contributed much to what was later, a newly independent Singapore’s economic success. Along with the industrial complex that was to set Singapore on its feet, there was of course the big effort to provide infrastructure to support the massive project, which included a somewhat forgotten extension to the railway network on the island, the old Jurong Line.

The now abandoned old Jurong Line was built in the 1960s to serve the Jurong Industrial Estate which was being developed.

The line runs through a corridor which has been relatively untouched by the modernisation that has overtaken the island over the last four decades and forms part of a proposal by the Nature Society of Singapore to preserve the former railway corridors as Green Corridors.

Jurong was in my childhood, one of the ends of the earth, being in what I had envisaged as a forsaken part of the island, good only for the seafood at Tuas village, that meant the long ride along the long and winding old Jurong Road that took one past the creepy stretch where the old Bulim cemetery was located. It was also the object of many school excursions to the area which had in the 1970s, the Jurong Birdpark added to the list of attractions that meant the long ride on the chartered bus which would pass the wonderfully wide tree lined avenue named International Road and culminate in the smell that we would always look forward to with anticipation – that of the aroma of chocolate that would invariably waft out of the Van Houten factory that stood on Jalan Boon Lay. It was only later that I came to know Jurong much better, spending 16 years of my life working in a shipyard at the end of Benoi Road.

The human train over the old railway line ...

It was around when I had first started work there that I started to notice the old Jurong Line, only once spotting a train passing over a level crossing that might have been at Tanjong Kling Road, not significant enough to have caught a mind that was distracted by the early days of my career. I had of course known about the bridges – a truss bridge, similar in construction and appearance to the glorious truss bridges of the main Railway Line that gives the Bukit Timah area some of its distinctive character, that crossed the Sungei Ulu Pandan that was visible from Clementi Road on the double decker bus service number 74 that I occasionally caught home from Clementi during my days in Singapore Polytechnic, as well as a less distinct on that crossed the Pandan River. Beyond noticing the obvious signs of the Jurong Line, I never did find the urge to learn about it until maybe a recent bout of nostalgia for the railway in Singapore brought about by the news that we will see the last of the trains crossing the island come the first day of July this year prompted the urge in me to explore what is now a disused line, and so when I heard of the ramble organised by the Nature Society, I decided to get dirty and muddy in the effort to learn more of the line.

The truss bridge across the Sungei Ulu Pandan at Clementi is a very well recognised landmark.

The walk along the line started at Teban Gardens, which itself was a housing estate that owes its own development to Jurong Industrial Estate which it sits on the fringe of. The estate was constructed in the early 1970s to supplement low cost housing in the area which had been in high demand, as more people found jobs in the Industrial Estate. The first flats were completed in 1976 by the Jurong Town Corporation (JTC) which had been the body responsible for the development of the Indistrial Estate and the flats in the area – along with other JTC developed housing estates in the west of Singapore, have a distinct character compared to the estates developed by the Housing and Development Board (HDB) during that time. The start of the walk in the setting of the fast rising sun, allowed the plots of vegetables and fruit trees to be revealed along that part of the corridor along that area on the approach to the abandoned tunnel that runs under Jurong Town Hall Road, a scene reminiscent of some of the rural scenes of Singapore that I had hitherto thought had been lost in the wave of development that has swept over Singapore. It was nice to return to the that Singapore for a while and take in the “fresh” country air that came with what appeared to be the ample use of fertilizer on the plots of vegetables.

Crossing what were the tracks at Teban Gardens.

A scene perhaps from the rural Singapore of old - small scale farming takes place along some tracts of land through which the corridor passes.

More scenes from what rural Singapore might have once looked like.

It was refreshing start to the walk which continued through one of the five tunnels that the line had featured when it was operational, along with eight steel bridges, three of which we walked across or walked by. Built at a cost of S$5.9 Million by the Malayan Railway with a loan from the Economic Development Board (EDB), construction on the line started in 1963 and was only completed in 1966 with total of 19.3 kilometres of tracks laid, although a public run was made as early as in November 1965. The first service commenced with its opening by Dato Ahmad bin Perang, the then General Manager of the Malayan Railway on 4 March 1966. The line, which branched off at Bukit Timah station and ran under a tunnel across Clementi Road towards the west, ended up at Shipyard Road behind the Mobil Refinery which was then being constructed, with a branch line running to the National Iron and Steel Mills (the estate’s first factory) and Jurong Port, and had apparently not been as well used as envisaged, and operation of the line finally ended in the mid 1990s without much fanfare, with the land being returned to the State and lies abandoned for the close to two decades that have passed.

The line featured five tunnels, including this one running under Jurong Town Hall Road.

Another view through the tunnel ...

The light at the end of the tunnel

The line also featured eight steel bridges, including this girder bridge across the Pandan River, along its 19.3 km of tracks from Bukit Timah Station to Shipyard Road and Jurong Port.

The abandonment was certainly pretty much in evidence throughout the walk, not just with “Danger” signs pretty much rendering the tunnel and the bridges along the route places we should have really avoided walking through or on. Trudging through the dark and dingy tunnel certainly wasn’t a walk in the park as the thick layer of mud that lined the ground meant a slow trudge towards the light at the end of the tunnel which was a small opening in the zinc sheet that was meant to prevent access into the tunnel at the other end. The first of the bridges we passed was the one across the Pandan River, which looked a little worse for wear and was boarded up to prevent access to it. After that, it was through the Faber Gardens corridor where besides the obvious signs of the abandoned tracks, some being overrun by the vegetation, there were also some nice bits of nature to take in, with even a creek that showed evidence of a swamp in the area with some swamp plants being very much in evidence. It was in the area where two members of the Shield Bug family said hello without giving off the almighty stink that they are known for. This certainly is reason enough to support the Nature Society’s proposal to turn the rail corridors into green corridors.

Signs of abandonment were pretty much in evidence all along the tracks ... this one at the east end of the tunnel ...

... and one at the Pandan River bridge ...

A train undercarriage's eye view of the bridge over the Pandan River.

An unspoilt part of Singapore - a creek by the old Jurong Line ... one of the compelling reasons to support the Nature Society's proposal to turn the areas around the tracks into a Green Corridor.

Shield bugs ... not uncommon, but rarely seen in urban Singapore these days.

Nature disturbed by the line but relatively unspoilt.

and in some instances, reclaiming their place on the old abandoned tracks.

More evidence of nature reclaiming the areas around the abandoned tracks.

It wasn’t long before we got to the Sunset Strip – the area behind Clementi Town along the Sungei Ulu Pandan that leads up to Sunset Way. That was where we walked into the Chinese temple and a few more reminders of a rural Singapore that is no more, including a water hyacinth pond (water hyacinth ponds were commonly seen as these were often used as fodder for pigs as well as in ponds treating pig waste in the old kampungs). From there, it was across first the rickety old truss bridge that the lack of maintenance on it very evident and looks as it it would be destined for the scrap yard unless my friends in the Nature Society have their way … that provided an excellent photo opportunity and despite the signs warning us not to cross and the clear evidence of a structure that bears the scars of being left in the hot and humid environment without any renewal made of coatings that would have kept the corrosive effects of the environment at bay, proved to be a safer bridge to walk across than the operational ones along the Bukit Timah corridor. It wasn’t far then for the human train to reach the sunset – Sunset Way – where another bridge – a grider bridge provides an overhead crossing over the road … where the short, but very interesting walk ended, leaving me with a much deeper impression of the old Jurong Line, and certainly of the proposal to turn the corridor into a green corridor, which I hope, won’t as the old Railways across Singapore, ride and fade into the sunset.

A temple by the former Railway land along the Sungei Ulu Pandan.

More scenes of what rural Singapore might have been like in the area around the temple.

Crossing the truss bridge across Sungei Ulu Pandan ...

Another view across the truss bridge.

The last leg of the walk towards Sunset Way.

The girder bridge over Sunset Way.

The view across the girder bridge at Sunset Way.





The Bridge over the River Kwai

22 12 2010

It might have been because of the nursery rhyme “London Bridge is Falling Down”, that I have held a long fascination with bridges, having many doses of it throughout my early childhood. It was a fascination that was also fed by my regular encounters with the two railway bridges from my childhood journeys through the Bukit Timah area, and of those with the magnificent Anderson and Cavenagh Bridges that sets our Civic District apart from much of the rest of Singapore, and maybe by the picture of the red oxide coated Forth Rail Bridge on the back of a postcard that my mother had for much of my childhood displayed on her dresser. There were of course bridges of significance that I encountered in my diet of war inspired movies and novels that might also have fed that fascination: one being “A Bridge Too Far” over Arnhem that was the subject of Cornelius Ryan’s novel which was adapted by William Goldman for the movie of the same name; and the so-called “Bridge on the River Kwai”, part of the infamous Death Railway, that was made famous by the 1957 David Lean movie based on a novel entitled “Bridge Over the River Kwai” by French writer Pierre Boulle, which I had watched many times on TV.

Poster for the movie "Bridge on the River Kwai".

The bridge over the River Kwai in Dec 1984.

The bridge in 2006.

That I guess was what compelled me to visit the bridge that stands over the River Kwai today, or the River Mae Khlung as it should rightly have been (the river has since been renamed as the “Kwai Yai” for the tourists). The bridge that stands today isn’t the wooden bridge built in 1943 that was the subject of the movie, but a second more sturdy bridge of concrete and steel built by the Prisoners of War (POW) also in 1943. It stands as a powerful symbol of the pain, suffering and death that was inflicted on the POWs who were put to work on the infamous Siam to Burma rail supply line that the Japanese intended to use on their push towards India. Estimates vary but at least 100,000 POWs and labourers died in the construction of the railway due to the harsh conditions, starvation and malaria.

A view of the bridge from the far bank. The two straight-sided spans were transported from Japan after the end of the war as part of Japanese war reparations, to replace the two original arched spans which were brought over from Java by the Japanese which were destroyed.

Another view of the bridge.

Information plate on one of the replacement spans.

One of the original arched spans which the Japanese brought over from Java.

My first visit to the bridge which is about 5 kilometres out of Kanchanaburi , which is located 130 kilometres west of Bangkok was in December 1984 – back then I was struck by the surreal calm that taking a walk on the bridge provided despite the presence of the tourists (not the hordes that one encounters these days) and the vendors trying to hawk a few souvenirs. I did return some twenty years later – dismayed to find that the bridge had been overrun by hordes of tourists and the area now dominated by the tourist shops that have somehow destroyed the peace that I had first encountered in 1984. Still, taking a walk on the bridge provides a wonderful experience, and certainly once across the bridge, the far back does provide that sense of calm absent on the near side.

Taking a photograph of the bridge in 1984.

On the bridge in 2006.

Around the bridge, there is the River Kwae Bridge railway station which is certainly worth a visit. The station in fact provides an gateway for rail passengers coming from the south who can make a connection at Nakhon Pathom, and also directly from Bangkok. The line itself runs over part of the original Death Railway route to Nam Tok. The line which was assessed to be too poorly constructed to support commercial use was sold by the British in 1946 to Siam for a sum of ₤1.5M which included 65 locomotives, 1125 wagons and other stock, and revived in 1948. The train also runs through and stops at the town of Kanchanaburi.

Ticket counter at the River Kwai Bridge Station.

River Kwai Bridge Station.

An old steam locomotive (#719) on display at River Kwai Bridge Station.

Beyond the area where the bridge is, it makes sense to also pay a visit to one of the war museums to have a sense of what went on, as well as the Kanchanaburi War Cemetery. The museum I visited was the JEATH (Japan, England, Australia Thailand, England) War Museum, which is housed inside the grounds of the Wat Chai Chumphon temple and is built around huts meant to replicate those that the POWs had been housed in and contains graphic images showing the conditions the prisoners had lived in.

Kanchanaburi War Cemetery in 1984.

Kanchanaburi War Cemetery.

Plaque at the entrance of the War Cemetery.

Plaque at the War Cemetery.

The JEATH War Museum.

Exhibit at the JEATH War Museum in 1984 with photographs of the bridge destroyed in 1945 by allied bombings.