Thought of as an essential transport link in the plan to transform the wild and undeveloped west into the industrial heart of Singapore, the Jurong railway line, which was launched in 1966, was one component of the grand scheme that never quite took off. Built with the intention to carry finished goods out of the huge manufacturing hub to the then domestic market in the Peninsula and to move raw materials to the new factories, the railway’s usefulness was to be surpassed by the efficient road transport network that was also in the works.

A remnant of the western reaches of the line in an area now taken over by nature.

A remnant of the western reaches of the line in an area now taken over by nature.

Jurong-Line-1980

An overlay of the western reaches of the industrial railway shown on a 1980 1:25,000 road map of Singapore over a Google Map by cartographer Mr Mok Ly Yng.

The first train that ran, on a 9 mile (14.5 kilometre) journey from Bukit Timah to Shipyard Road on 11 November 1965, was greeted with much anticipation. Some $5.5 million had been invested on the railway. A total of 12 miles (19 kilometres) of tracks were being laid for the project. Passing over eight bridges and through three tunnels, the railway was expected to handle up to 2 to 3 million tons of cargo a year (see Straits Times report dated 12 November 1965, Jurong Railway makes first public run). It does seem that the railway, even in its first decade, fell short in terms of the anticipated amount of cargo it handled. A Report in the New Nation’s 2 June 1975 edition mentions that only 128,000 tons of cargo had been carried by the railway in 1974. The railway’s last whistle blew unnoticed, possibly some time in the early 1990s, barely a quarter of a century after its inauguration. The land, leased from the Jurong Town Corporation (JTC), was returned and lay relatively untouched and the railway left abandoned and largely forgotten.

The first train coming to a halt at the western reach of the line next to the Mobil refinery (still under construction) at Shipyard Road (photo: National Archives online).

A scattering of broken concrete now marks the spot.

Now, some two decades after its abandonment, we are seeing what’s left of the railway fade further away. Large portions of the land on which it ran has in more recent times been turned over to more productive use. With the pace of this quickening of late, it may not be long before we see what is left of it lost to the now rapidly changing landscape of the industrial west. This was in fact very much in evidence during a recent walk I took with a few friends along the line’s western reaches. The once continuous corridor we had hope to walk along, is now interrupted by recent development activity, many of which take the shape of the multi-level ramp-up logistics facilities that increasingly seem to flavour the west.

What seems to dominate the industrial landscape of the west - the new ramp-up logistics facilities that now rise up above the zinc factory roofs.

What seems to dominate the industrial landscape of the west – the new ramp-up logistics facilities that now rise up above the zinc factory roofs.

The more visible reminders of the railway, at least in the area west of Teban Gardens, are probably found in its final kilometre close to where it came to a halt at Shipyard Road. A scattering of broken concrete, possibly the broken foundations of the railway buffers, marks what would have been the journey’s end. Following the line eastwards towards Tanjong Kling Road from that point will be rewarded with the former corridor’s western reaches’ largest sections of tracks and a concentration of railway signs. The section just east of refinery Road, would have been where several cement factories, which the railway was known to serve, were located.

Tracing the western reaches ....

Tracing the western reaches ….

Nature having its way over what's left of the tracks.

Nature having its way over what’s left of the tracks.

The western end of what is left of the tracks.

The western end of what is left of the tracks.

Nature taking over.

Nature taking over.

A section of the tracks.

A section of the tracks.

More signs of nature taking over.

More signs of nature taking over.

The now widened Tanjong Kling Road, where a level crossing was located at, marks the end of the section in which the rusting tracks can be found west of Teban, that is until Jurong Port Road. The curious sounding Tanjong Kling, a cape down the road of the same name, formerly Jalan Besi Baja, is where one finds a significant landmark in the industrialisation of Jurong, the National Iron and Steel Mills. The factory, was Jurong Industrial Estate’s first to start production on 2 August 1963. It has since been bought over by Tata Steel.

Tracks close to where the crossing at Tanjong Kling Road would have been.

Tracks close to where the crossing at Tanjong Kling Road would have been.

A level crossing sign.

A level crossing sign before Tanjong Kling Road.

There are several suggestions as to how the tanjong got its name. A rather intriguing suggestion is one that links it to one of the many fascinating tales of the Sejarah Melayu or Malay Annals, the story of Badang. A 14th century champion of the king of Singapura whose strength was legendary, his reputation had reached the shores of the Kling kingdom (the term “Kling”, while regarded today as a derogatory reference to Indians, was commonly used term in the Malay language thought to have been derived from Kalinga, a southern Indian kingdom). This prompted the Rajah of Kling to send his strongman to Singapura to challenge Badang. The challenge, which some have it as having taken place at Tanjong Kling (hence its name), was won with ease by Badang. The champion of Singapura was not only able to lift a huge stone that the Kling strongman could only lift to the height of his knees, but also toss it, as the tale would have it, to the mouth of what is thought to be the Singapore River. There is a suspicion that this stone, was the same stone – the Singapore Stone, that once stood at the mouth of the Singapore River.

The first break in the continuity of the former corridor where a ramp-up logistics facility is being built just across the former crossing at Tanjong Kling Road.

A break in the continuity of the former corridor where a ramp-up logistics facility is being built just across the former crossing at Tanjong Kling Road.

Badang, if he were to take up the same challenge up today, might have required just a little more effort to send the stone in the same direction. Man-made obstacles of a different stone now surround the area around Tanjong Kling, one of which, a tall ramp-up logistics facility, now straddles the path the trains once took – just across Tanjong Kling Road. The newly built structure, cut our intended path off towards the western most of Singapore’s railway bridges.  A concrete girder bridge across Sungei Lanchar, its somewhat modern appearance tells us that it is a more recent replacement, possibly made necessary by  canal widening, for what would have been one of the line’s original bridges.

The western most railway bridge - a modern concrete bridge.

The western most railway bridge – a modern concrete bridge over Sungei Lanchar.

On the bridge over the Jurong River.

On the bridge over Sungei Lanchar.

Our attempt to follow the path of the railway was further hampered by recent extensions of factory spaces into the former corridor and a detour was required to take us to the location of the westernmost rail tunnel under Jalan Buroh. The tunnel, now a series of tunnels, lies under the huge roundabout and under the shadow of the bridge linking Jurong Pier Road to Jurong Island. This was to be the last we were to see of the former railway before we came to another former crossing that carried the trains across Jurong Port Road. We were to discover that all traces of the two southbound spur lines on either side of Jurong Port Road we had hope to walk along, still around until fairly recent times, have also all but disappeared.

In search of the tunnel under the Jurong Pier Circus.

In search of the tunnel under the Jurong Pier Circus.

A view of the tunnel, now obscured by vegetation.

A view of the tunnel, now obscured by vegetation.

The tunnel under Jalan Buroh seen in 1965 (National Archives online).

Another logistics facility standing where the line ran along Jurong Pier Road.

Another logistics facility standing where the line ran along Jurong Pier Road.

A southward view from Jalan Buroh towards what was the corridor along which the spur line west of Jurong Port Road ran.

A southward view from Jalan Buroh towards what was the corridor along which the spur line west of Jurong Port Road ran.

Where the  same spur line ran northwards.

Where the same spur line ran northwards.

The southward view to where the spur line east of Jurong Port Road ran.

The southward view to where the spur line east of Jurong Port Road ran.

A new road, evident from the plastic protection still on the road sign, running northward along what was the spur line east of Jurong Port Road.

A new road, evident from the plastic protection still on the road sign, running northward along what was the spur line east of Jurong Port Road.

Unable to follow our intended path, we settled for a walk up Jurong Port Road. This was rewarded with a rather interesting find in a factory building with its name in Chinese made using characters attributed to the hand of a renowned calligrapher, the late Pan Shou. The far end of the road from the factory, just south of what would have been Jalan Ahmad Ibrahim (now the Ayer Rajah Expressway or AYE), we find evidence of the former level crossing in a pair of metal rails embedded into the road. Close by are also several remnants of the tracks running east into what now seems to be a space for parking of heavy vehicles.

The detour we had to take along Jurong Port Road threw up an  interesting find - a factory building with its characters in Chinese made by the strokes of a renowned calligrapher Pan Shou.

The detour we had to take along Jurong Port Road threw up an interesting find – a factory building with its characters in Chinese made by the strokes of a renowned calligrapher Pan Shou.

Tracks of the former level crossing are in evidence at Jurong Port Road.

Tracks of the former level crossing are in evidence at Jurong Port Road.

Tracks seen in what seems to be used as a lorry parking space just south of the former Jurong Bus Interchange.

Tracks seen in what seems to be used as a lorry parking space just south of the former Jurong Bus Interchange.

The end of the lorry park, which lies south of the site of another one time Jurong landmark, the former Jurong Bus Interchange, is where another girder bridge, is to be found. Possibly one of the original steel bridges, the railway tracks one the bridge is still largely intact. Further east, traces of the line disappear until the area just past the pedestrian overhead bridge across the AYE from Taman Jurong. Here, some sleepers can be seen, embedded into a seemingly well trodden path.

The bridge close to the former Jurong Bus Interchange.

The steel girder bridge close to the former Jurong Bus Interchange.

A view on top of the bridge.

A view on top of the bridge.

The area once occupied by the former interchange.

The area once occupied by the former interchange.

Evidence of the tracks off the AYE.

Evidence of the tracks off the AYE across from Taman Jurong.

Further east, we come to the part of Singapore that will serve the railway of the future as its end point. The journey of the future, to the west of Singapore from Kuala Lumpur, would involve an amount of time that would probably be a little more that the time it might have taken the industrial trains of old to make the journey down from Singapore’s north – not counting the time it would take to clear border formalities. Just across the AYE from the future terminus, the industrial trains, running along the former Jalan Ahmad Ibrahim, would have passed over Sungei Jurong. A long span concrete girder bridge, another that is probably more recent, tells us of this, as does the remnants of another steel girder bridge – the last piece of the railway we were to discover before the end of what turned out to be a 10 kilometre walk.

The concrete bridge - across the Jurong River.

The concrete bridge – across the Jurong River.

On the evidence of what we saw during the long but not so winding walk was how the landscape of the industrial west is rapidly changing. Ramp-up logistics hubs are now growing out of spaces that would once have been given to low-rise production facilities and large parts of the former rail corridor. This signals a shift towards a fast-growing industrial sector that now accounts for some 9% of Singapore’s GDP.  What was also evident is that it will not be long before all traces of the railway in the industrial west is lost and with that the promise with which the first train ran in the first few months of our independence, will completely be forgotten.


See also: Photographs of the remnants of the same stretch of line taken by Mr Leong Kwok Peng of the Nature Society in 2011.

Advertisement




The sun sets over the rail corridor

21 07 2011

The 17th of July was a day when the railway corridor would have been seen in its original state for the very last time. The corridor, having been one of the few places in Singapore where time has stood still – little has changed over the eight decades since the railway deviation of 1932, would after the 17th see an alteration to it that will erase much of the memory of the railway, barely two weeks after the cessation of rail services through Singapore and into Tanjong Pagar. It was a railway that had served to remind us in Singapore of our historical links with the states of the Malayan Peninsula – the land on which the railway ran through having been transferred to the Malayan Railway through a 1918 Ordinance, a reminder that has endured well into the fifth decade of our independence.

The 17th of July offered most in Singapore a last chance to walk the tracks ... removal work started the following day with only a short 3km stretch of the tracks opened to the public unitl the end of July.

It was in the pale light of the moon that my last encounter with the railway tracks in the Bukit Timah Station area began.

The corridor is one that I have had many memories of, having had many encounters with it from the numerous train journeys that I made through Tanjong Pagar, as well as some from encounters that I had from my younger days watching from the backseat of my father’s car and also those that I had in clothed in the camouflage green of the army during my National Service. There are many parts of it that are special in some way or another to me, having always associated them with that railway we will no longer see, and the last day on which I could be reminded of this warranted a last glance at it, one that got me up well before the break of dawn, so that I could see it as how I would always want to remember it.

A scene that would soon only be a memory - the rail corridor on the 17th of July 2011.

It was at a short but very pretty stretch of the corridor that I decided to have a last glance at – a stretch that starts at the now empty and silent building that once served as Bukit Timah Station and continues south for another two kilometres or so. It was one that is marked by some of the most abundant greenery one can find along the corridor which even from the vantage of the train, is always a joy to glance at. Arriving in the darkness of the early morning, it was only the glow of the light of the waning but almost full moon that guided me towards the station which is now encircled by a green fence which I could barely make out. I was greeted by a menacing red light that shone from the end of the building, one that came from the security camera that even in the dark seemed out-of-place on the quaint structure that been the last place along the line where an old fashioned practice of exchanging a key token took place. The crisp morning air and the peace and calm that had eluded the corridor over the two weeks that followed the cessation of railway operations was just what I had woken up for and I quickly continued on my way down towards the concrete road bridge over the railway at Holland Road.

First light on the 17th along the corridor near Holland Green.

It wasn’t long before first light transformed the scene before me into a scene that I desired, one that through the lifting mist, revealed a picture of calm and serenity that often eludes us as we interact with our urban world. It is a world that I have developed a fondness for and one in which I could frolic with the colourful butterflies and dragonflies to the songs of joy that the numerous bird that inhabit the area entertain us with. It was a brief but joyous last glance – it wasn’t too long before the calm with which the morning started descended into the frenzy of that the crowds that the closing of the railway had brought. That did not matter to me as I had that last glance of the corridor just as I had wanted to remember it, with that air of serenity that I have known it for, leaving it with that and the view of the warm glow of the silent tracks bathed in the golden light of the rising sun etched forever in my memory.

First signs of the crowd that the closing of the railway brought.

A last chance to see the corridor as it might have been for 79 years.

For some, it was a last chance to get that 'planking' shot.

Signs of what lay ahead ... the secondary forest being cleared in the Clementi woodland area to provide access for removal works on the railway tracks in the area.

Weapons of rail destruction being put in place.

The scene at the truss bridge over Bukit Timah Road as I left ...

Despite coming away with how I had wanted to remember the rail corridor, I did take another look at another area of it that evening. It was at a that stretch that is just north of the level crossing at Kranji, one that would in the days that have passed us by, would have led to a village on stilts that extended beyond the shoreline, one of the last on our northern shores. The village, Kampong Lorong Fatimah, now lies partly buried under the new CIQ complex today, and had stood by the side of the old immigration complex. Today, all that is left of it beyond the CIQ complex is a barren and somewhat desolate looking piece of land, one that feels cut-off from the rest of Singapore. The stretch is where the last 2 kilometres of the line runs before it reaches Woodlands Train Checkpoint, an area that is restricted and one where it would not be possible to venture into. And it is there where the all train journeys now end – a cold and imposing place that doesn’t resemble a station in any way.

What's become of the last level crossing to be used in Singapore - the scene at Kranji Level Crossing with road widening works already underway.

Another view of the former level crossing, concrete blocks occupy the spot where the yellow signal hut once stood.

An outhouse - the last remnant of the crossing left standing.

Walking through the area, it would not be hard to notice what is left of the huge mangrove swamp that once dominated the area – evidence of which lies beyond a girder bridge (the northernmost railway bridge in Singapore and one of three that would be removed) that crosses Sungei Mandai Besar some 700 metres north of the level crossing. The corridor here for the first kilometre or so is rather narrow with a green patches and cylindrical tanks to the east of it and an muddy slope that rises to what looks like an industrial area to the west. It is through the area here that I pass what was a semaphore signal pole – the northernmost one, before coming to the bridge.

The scene just north of the crossing.

The northernmost semaphore signal for the crossing in Singapore.

The last trolley on the tracks?

The northernmost railway bridge - the girder bridge over Sungei Mandai Besar. The bridge is one of three along the line that will be removed.

Sungei Mandai Besar.

It is about 200 metres beyond the bridge that the corridor starts to fan out to accommodate a loop line which looked as if it had been in a state of disuse with sleepers and rails missing from it. To the east of this widened area, tall trees and a grassland line the corridor and to the west, line of dense trees and shrubs partailly obscures part of the mangrove that had once stretched down to the Sungei Kadut. It is just north of this that the relatively short trek comes to an abrupt end. On the approach to Woodlands Train Checkpoint, sandbags over what had been the main line and a huge red warning sign serving as a reminder of what lay ahead. It is at the approach to the checkpoint that two signs serve as barriers to entry. It is beyond this that one can see a newly installed buffer at the end of the main line, and it is in seeing this that the realisation that that now is the end of a line, not just for the railway that ran through Singapore, but also for that grand old station which now lies cut-off from the railway that was meant to elevate it to a status beyond all the stations of the Far East. With the physical link now severed, that promise would now never be fulfilled, and all that is left is a building that has lost its sould and now stands in solitude, looking somewhat forlorn.

200 metres north of the bridge, the corridor widens to accommodate a loop line.

Evidence of the mangrove that once dominated the area right down to Sungei Kadut.

The northernmost stretch of the corridor.

Walking the bicycle over the wide strecth just short of Woodlands checkpoint.

Dismantling work that was already in evidence.

Sandbags on what was the main line and a warning posted ...

The end of the line- Woodlands Train Checkpoint lies beyond the signs.

It was at this point that I turned back, walking quietly into the glow that the setting sun had cast on the railway corridor. It is at Kranji that the setting sun and the skies above seemed to have conspire to provide a fitting and brilliant show over the place where there had once been an equally colourful crossing with its yellow hut and old fashioned gate. It was in the golden glow of the sunset that I spotted a fmailiar face, one of a fellow traveller on that tearful final journey out of Tanjong Pagar on the morning of the last day of train operations through Singapore, Mr Toh. Mr Toh is one who has been travelling on the trains out of and back into Tanjong Pagar since he was one, was on his final nostalgia motivated journey that final day just as I was, and was at Kranji to complete a final leg of his own exploration of the entire length of the tracks through Singapore. We exchanged our goodbyes, at the same time saying one last goodbye to the railway, as night fell on the last level crossing that was used in Singapore, and on the railway corridor as we had known it for one last time.

A track back into the colours of the setting sun.

A final look south towards Kranji Road.

The view of the setting of the sun over the railway at Kranji Road.

Night falls over the railway corridor as we knew it for one last time.


Posts on the Railway through Singapore and on the proposal on the Green Corridor:

I have also put together a collection of experiences and memories of the railway in Singapore and of my journeys through the grand old station which can be found through this page: “Journeys through Tanjong Pagar“.

Do also take a look at the proposal by the Nature Society (Singapore) to retain the green areas that have been preserved by the existence of the railway through Singapore and maintain it as a Green Corridor, at the Green Corridor’s website and show your support by liking the Green Corridor’s Facebook page. My own series of posts on the Green Corridor are at: “Support the Green Corridor“.






A final journey: the last passage to the north

5 07 2011

From where I left off on the previous post, the 0800 Ekspres Rakyat left Tanjong Pagar late at 0838. The train then continued its passage to the north, a passage that I would be able to take in for the very last time from the vantage point of a train – the final homecoming on The Last Train into Tanjong Pagar coming in the dark of night. The passage has been one that I have especially been fond of, taking a passenger on the train past sights of a charming and green Singapore that is hidden from most, sights which in entirety can only taken in from the train. This last passage in the dim light of the rainy morning was one that was especially poignant for me, knowing that it would be one that I would take accompanied by the groan of the straining diesel locomotive, the rumbling of the carriages over the tracks, and the occasional toot of the whistle.

The morning train offered passengers a last glance at the passage through the rail corridor in Singapore.

The short passage takes all but half an hour, taking the train from the greyer built-up south of the island around where Tanjong Pagar Station is, to the greener north of the island. The passage takes the train first out from the platform and through an expansive area where the view of the familiar train yard is mixed with the familiar sights of the Spottiswoode Park flats, the old and new signal houses, and the Spooner Road flats, before it goes under the Kampong Bahru Bridge towards the corridor proper. The initial 10 minutes of the passage is one that brings the train past Kampong Bahru, along the AYE for a distance, before coming to the first bit of greenery as it swings past Alexandra Hospital and up the Wessex Estate area towards the flats to the right at the Commonwealth Drive / Tanglin Halt areas – an area I am acquainted with from spending the first three and the half years of my life in. It is just after this, close to where the actual train stop which gave its name to Tanglin Halt first encounters a newer and more desired railway line, passing under the East-West MRT lines at Buona Vista.

The Spooner Road KTM flats on the left and the Spottiswoode Park flats in the background as well as the expansive train yard provided the backdrop for many a journey out of Tanjong Pagar.

It is soon after that the anticipation builds as the train passes by the Ghim Moh flats towards Henry Park. Just north of this is the area with arguably the prettiest bit of greenery along the entire stretch of the green corridor. We come to that the train passes under the concrete road bridge at Holland Road. The sight of the bridge also means that the train is just a minute or so away from what used to be the branch-off for the Jurong Line which served the huge industrial estate, and then what is perhaps the jewel in the crown along the corridor, the quaint old station at Bukit Timah. At Bukit Timah Station the old fashioned practice of changing the key token to hand back and over authority for the two sections of the single track through Singapore is undertaken, a practice replaced by technology along the rest of the Malayan Railway line. Beyond Bukit Timah is the rather scenic passage to the north through whichtwo truss bridges, four girder bridges and five level crossings are crossed before reaching the cold and unfriendly train checkpoint at Woodlands. That offered the passenger the last fifteen minutes to savour the passage through Singapore and some of the sights that will not be seen again. The level crossing are one of those sights – something that is always special with the sight of cars waiting behind the barriers or gates, yielding to the passing train – a rare sight that I for one have always been fond of seeing. All too soon it had to end … the rain washed morning provided an appropriate setting for what now seems like a distant dream, one of a forgotten time and certainly one of a forgotten place.

The 30th of June saw the last time the exchange of key tokens being carried out along the KTM line. Bukit Timah Station was the last place where the old fashioned practice of handing authority to the trains using a single track was carried out on the Malayan Railway.

II

the last passage to the north

0839: A last glance at Tanjong Pagar Station as the Ekspres Rakyat pulls out.

0839: A quick glance the other way at teh old signalling house ...

0839: The train pulls past the cluster of houses before the train yard comes into sight.

0839: The new signalling house comes into sight.

0840: The train passes a locomotive being moved from the train yard.

0840: A ast glance at where the Spooner Road flats which housed the railway staff and their families.

0843: A passenger Gen smiles in the passageway of the train carriage. Gen was the last to decide to join the group, deciding only to do so the previous day.

0848: The train passes under the new railway, the MRT line at Buona Vista. Hoardings around seem to indicate that the area would soon be redeveloped.

0848: The Ghim Moh flats come into view.

0851: Through the greenest area of the Green Corridor - the Ulu Pandan area close to where the Jurong Line branched off.

0853: Bukit Timah Station comes into view ...

0853: Key tokens are exchanged as a small crowd looks on ... the train slows down but doesn't stop.

0853: The train crosses the first of two truss bridges over the Bukit Timah Road ...

0854: A look back towards the bridge and Dunearn Road ....

0854: The train speeds past Rifle Range Road and the strip of land next to what was the Yeo Hiap Seng factory .... this is one area that I well remember on my first train journey in 1991 when the narrow strip of land hosted the small wooden shacks of many squatters who occupied this stretch of railway land.

0854: A glance at to the right at Rifle Range Road

0854: Passing over the danger spot close to where the short cut many take to Jalan Anak Bukit is.

0854: The train passes under the road bridges at Anak Bukit ...

0855: The bridges at Anak Bukit are left behind ...

0855: Over the girder bridge at Hindhede Drive

0856: The very green corridor near Hindhede Quarry ...

0856: Into the mist at the foot of Bukit Timah Hill towards the second truss bridge.

0857: A passenger Angie, sticks her head out to have a better look at the amazing greenery.

0858: The train continues on its way after crossing the second truss bridge.

0858: Through the Hillview pass.

0859: A lone man greets the train with an umbrella near the Dairy Farm Road area.

0859: The greenery greets the train around the Bukit Gombak area.

0859: The closed gate and waiting cars at the first of five level crossings at Gombak Drive.

0900: Towards the second and widest level crossing at Choa Chu Kang Road ... Ten Mile Junction comes into view.

0900: A small group of people gathered at the Choa Chu Kang Road level crossing to greet the passing train. The signal hut marks the location of what was Bukit Panjang Railway Station from where the first train to pull into Tanjong Pagar Station departed on 2nd May 1932 at 4.30 pm.

0901: Across the Bukit Panjang (or Choa Chu Kang Road) level crossing and under another new railway line - the Bukit Panjang LRT.

0902: Past an area I became acquainted with through my days in National Service ... the Stagmont Hill area.

0903: Across the third level crossing at Stagmont Ring Road.

0904: The fourth level crossing the Mandai crossing at Sungei Kadut Avenue.

0904: Past the KTM houses at Sungei Kadut Avenue and onward towards Kranji.

0907: Across the last (and narrowest) of the level crossings at Kranji Road and on towards Woodlands Train Checkpoint.

0907: Looking back at the Kranji level crossing and at the last of the rail corridor through Singapore ... time to get left to disembark the train for immigration clearance out for the very last time.

0908: Arrival at Woodlands Train Checkpoint - no photo taking allowed.


Posts on the Railway through Singapore and on the Green Corridor:

I have also put together a collection of experiences and memories of the railway in Singapore and of my journeys through the grand old station which can be found through this page: “Journeys through Tanjong Pagar“.

Do also take a look at the proposal by the Nature Society (Singapore) to retain the green areas that have been preserved by the existence of the railway through Singapore and maintain it as a Green Corridor, at the Green Corridor’s website and show your support by liking the Green Corridor’s Facebook page. My own series of posts on the Green Corridor are at: “Support the Green Corridor“.